My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP Request for Proposals Draft (3)
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
PRRIP Request for Proposals Draft (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:37:38 PM
Creation date
6/4/2009 1:58:33 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.600
Description
Requests for Proposals
State
CO
Basin
South Platte
Water Division
1
Date
10/31/2007
Author
PRRIP
Title
PRRIP Request for Proposals Draft
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />3) Detailed cost of the annual costs for each po <br />cost for each policy. If more than one limit of <br />provided for each policy and each level of prol <br />is needed for implementation of this contract. <br />4) References. Names, addresses, and phone <br />Please submit your proposal electronically in PDF f <br />Dr. Jerry Kenny <br />Executive Director <br />Platte River Recovery Implementation Program <br />3710 Central Avenue, Suite E <br />Kearney, NE 68847 <br />(308) 237-5728 <br />kennyj (q-)headwaterscorp. com <br />Terms and Conditions: The selected contractor <br />Nebraska Community Foundation <br />650 J Street, Suite 305 <br />PO Box 83107 <br />Lincoln, NE 68501 <br />Terms and conditions will be negotiated as mutual <br />reserved by the Govemance Committee to accept E <br />proposal, and to waive any irregularities in any prc <br />Point of Contact: Questions regarding this RFP tha <br />services should be e-mailed to Jerry Kenny at kenn <br />responses will be provided by e-mail to all bidders, <br />. The proposal should identify annual <br />ility is praposed, then the costs should be <br />on. The, Ciavernance Committee approval <br />of at least three references. <br />by November 30, 2007 to: <br />be retained by: <br />? agreeable;. It is understood that the right is <br />iy proposal t]Zat, in its judgment, is the best <br />could impact budget estimates or scope of <br />headwate;rscorp.com. Questions and <br />2
The URL can be used to link to this page
Your browser does not support the video tag.