My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP Request for Proposals Draft (2)
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
PRRIP Request for Proposals Draft (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:37:37 PM
Creation date
6/4/2009 1:51:36 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.600
Description
Requests for Proposals
State
CO
Basin
South Platte
Water Division
1
Date
12/4/2007
Author
PRRIP
Title
PRRIP Request for Proposals Draft
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PRRIP - ED OFFICE DRAFT <br />12/04/2007 <br />Prospective contractors should address their capability to comply with the above schedule. If <br />it is deemed that the above critical dates should be revised, prospective contractors should <br />offer alternative schedules describing the logic and reasons for the alternative. <br />3. Conflicts of Interest Statement addressing whether or not any potential conflict of interest <br />exists between this project and other past or on-going projects, including any projects <br />currently being conducted for the Program. <br />4. Detailed cost not to exceed proposal to complete the project, separated into protocol <br />development and protocol implementation. The proposal should identify costs and hours <br />allocated for each task in the scope of work and the total cost for the study. Hourly rates and <br />reimbursable expenses for the proposing firm/individual and any sub-contractors must be <br />attached to the detailed price proposal. The contract will be awarded on a Cost Not to <br />Exceed basis. The initial contract will be for protocol development. Governance Committee <br />approval is needed before the contractor is authorized to begin protocol implementation. <br />List of relevant project experience within the past five (5) years, including name, location <br />and brief description of the projects; name, address and phone number of the contracting <br />officer for the client; and identification of key participants and their tasks on previous <br />projects who would also be working on this study. <br />6. Resumes of key participants and subcontractors proposed for this study. The resumes should <br />address experience on projects similar to this stage change study. Types of expertise that <br />may be appropriate include familiarity with river hydraulics and hydrology, gage data <br />collection and analysis, the Platte River, and river monitoring and research techniques. <br />7. Equipment list sufficient to complete study. <br />8. Detailed methods describing how the above objectives will be addressed. Includes field <br />methods, data analysis, and quality control measures. <br />9. Description of Insurance shall be provided with the proposal. Proof of insurance will be <br />required before a contract is issued. Minimum insurance requirements will include <br />$1,000,000 general liability per occurrence. To the extent authorized by law, the contractor <br />shall indemnify, save, and hold harmless the Nebraska Community Foundation; the states of <br />Colorado, Wyoming, and Nebraska; the Department of the Interior; members of the <br />Governance Committee; and the Program Executive Director's Office, their employees, <br />employers, and agents; against any and all claims, damages, liability, and court awards <br />including costs, expenses, and attorney fees incurred as a result of any act or omission by the <br />contractor or its employees, agents, subcontractors, or assignees pursuant to the terms of this <br />proj ect. <br />10. A pre-bid meeting of interested parties will be held to address questions associated with this <br />Request for Proposals at a time and location that will be set by the Program's Executive <br />Director's Office. <br />2
The URL can be used to link to this page
Your browser does not support the video tag.