Laserfiche WebLink
from Lake McConaughy necessary to meet flow targets at Overton (supplemented by <br />flows from Tamarack I). With this approach, the resulting peak flow at Overton is <br />limited by the system capacities and not the available supply of EA water in Lake <br />McConaughy. This approach focuses on conveyance constraints that are limiting, <br />helps to limit the number of potential routing solutions for a particular study year, and <br />answers the question, "How much water would need to be released from Lake <br />McConaughy in an attempt to achieve the pulse flow target". <br />93042E Page 22 of 58 January 29, 2008 <br />PRRIP - Draft Water Management Study, Phase I