My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
22 (10)
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
DayForward
>
1-1000
>
22 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:37:18 PM
Creation date
6/2/2009 11:42:23 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/20/2009
Description
WSP Section - Tamarisk Control Cost Sharing Grant Pr9ogram - Transmittal of Grant Applications
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br /> <br />Tamarisk and Russian Olive (tlTRO") Control Cost Sharina Grant Evaluation Cri!!!!:!!! <br />Rating Criteria Avaiilable <br />oinlts <br />Not scored <br />Failure to meet <br />any of these <br />elements will <br />result in <br />rejection of the <br />application <br /> <br />. <br /> <br />Capacity of Applicant (per Guidance Section II LA): How well does the applicant <br />meet the minimum qualifications and demonstrate the capability to accomplish the <br />ro osed work? Maximum 20 Points <br />History of working cooperatively in partnership with local land owners, other <br />communit or anizations and local, state and federal a encies. <br />Additional level of cash and in-kind match (beyond the 50% minimum) provided by <br />the a licant or anization and artners. <br />Applicant organization's demonstrated history of accomplishments in regards to <br />activities similar to the ro osed ro'ect. <br />Level of staffing (volunteer or paid) and expertise the applicant organization will <br />dedicate to ro osed ro'ect. <br /> <br />Max" 20 points <br /> <br />0-5 <br /> <br />0-5 <br /> <br />0-5 <br /> <br />0-5 <br /> <br /> <br />Effectiveness ofthe Project (per Guidance Section III.B): How consistent and Max. 60 points <br />effective is the proposal at accomplishing the goals and priorities of the watershed <br />TRO control Ian? Maximum 60 Points <br />Measurable results that will have a significant impact on improving the health of the 0-15 <br />watershed consistent with the State approved TRO control plan. The project is <br />consistent with priorities established in the plan and coordinated with other TRO <br />activities in the watershed. <br />The proposal is complete and the proposed implementation steps will accomplish the 0-15 <br />stated goals of the proposal. Design minimizes the likelihood of re-infestation of the <br />ro'ect area throu h effective reve etation, monitorin ,and maintenance lans. <br />Principles of IPM (biocontrol, chemical, mechanical, etc.) are well utilized. Chosen 0-10 <br />control methods are the most a ro riate techni ues for the s ecific ro'ect area. <br />The proposal is effective in furthering the CWCS's multi-objective missions relative to 0-10 <br />watershed restoration and protection of water resources such as enhancing instream <br />flow se ments, facifitatin water deliveries or miti atin flood risks. <br />The proposed project schedule is realistic. Anticipated environmental compliance 0-10 <br />and permitting issues (for example: 404 dredge/fill, herbicide application, insect <br />releases, NEPA, etc) are adequately addressed so as not to delay project <br />im lementation. <br /> <br />. <br /> <br />Multi-Objective Priority and Bonus Factors (per Guidance Section III.C): What Max. 20 Points <br />other watershed and CWCB ob'ectives are achieved? Maximum 20 Points <br />Project makes effective utilization of labor from Colorado Youth Corps ("CYC") or 0-5 <br />other non- rofit or anizations. <br />The Project is consistent with the goals for priority areas established by Colorado 0-5 <br />weed re ulations, in articular the salt cedar mana ement Ian: BCCR 1206-2 art 4. <br />The Project includes reliable method to assess and/or quantify changes in riparian 0-5 <br />h drolo as a result of control and reve etation. <br />The Project incorporates an educational component (such as school field trips, 0-5 <br />volunteer recruitment, news media coverage, etc.) that increases public awareness <br />of TRO issues or includes innovative strate for biomass reduction/utilization. <br /> <br />. <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.