My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
22 (10)
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
DayForward
>
1-1000
>
22 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:37:18 PM
Creation date
6/2/2009 11:42:23 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
5/20/2009
Description
WSP Section - Tamarisk Control Cost Sharing Grant Pr9ogram - Transmittal of Grant Applications
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.. <br /> <br />-- <br /> <br />Effectiveness of the Project: <br />Measurable results that will have a significant impact on improving the health of thel watershed <br />consistent with the State approved TRO control plan. The project is consistent with priorities <br />established in the plan and coordinated with other TRO activities in the watershed. Refer to <br />the attached statement of the existing ecological condition. <br /> <br />The proposal is complete and the proposed implementation steps will accomplish the stated <br />goals of the proposal. Design minimizes the likelihood of re-infestation of the project area <br />through effective revegetation, monitoring, and maintenance plans. <br /> <br />Principles of IPM (biocontrol, chemical, mechanical, etc.) are well utilized. Chosen control <br />methods are the most appropriate techniques for the specific project area. <br /> <br />The proposal is effective in furthering the CWCS's multi-objective missions relative to <br />watershed restoration and protection of water resources such as enhancing instream flow <br />segments, facilitating water deliveries or mitigating flood risks. <br /> <br />The proposed project schedule is realistic. Anticipated environmental compliance and <br />permitting issues (for example: 404 dredge/fill, herbicide application, insect releases, NEPA, <br />etc) are adequately addressed so as not to delay project implementation. <br /> <br />5 <br /> <br />. <br /> <br />. <br /> <br />. <br />
The URL can be used to link to this page
Your browser does not support the video tag.