Laserfiche WebLink
Status of Phase <br />Assessment of 13 WAP Projects <br />- 13 projects on-line with perfect timing of releases <br />could provide 10,000 cfs <br />- Could provide 210 cfs of the 800 cfs assuming no <br />losses and controlled timing <br />- 11 could provide managed flows on a daily basis if <br />exchanged to EA in McConaughy or storaqe aInnq <br />CNPPID system <br />- To effectively contribute to flow targets, will need to <br />b ?nataghy or other storage <br />?.. <br />Status of Phase <br />• Next Steps <br />• Governance Committee Workshop (Today) <br />• Finalize Phase I Report <br />• Phase II <br />- Refinement of tools and sensitivity <br />- Evaluation of additional alternatives <br />9