My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Management Study: Phase 1
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
Water Management Study: Phase 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:37:05 PM
Creation date
6/2/2009 10:13:27 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.550
Description
Water Advisory Committee & Water Advisory Planning
State
CO
Basin
South Platte
Water Division
1
Date
2/13/2008
Author
Jeff Bandy & Blaine Dwyer
Title
Water Management Study: Phase 1
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Status of Phasc <br />Problem Statement <br />1. Proviee 5,000 ds ol Program Water br Ihree days lo ihe Overton gage on the Platle River in <br />centrai Nebreska lor pulse Iluws when other demands that may be compettng br nver <br />channel and imgation systom capacity are bw (normally September t- May 31). Assuming <br />thls wator-deUvery availabdity. Program water may be used to supplement ewsting flows to <br />achieve pulse Ibws in excoss oi 6,000 cfs two out of Ihree yeers. II these Iiows are achieved <br />by ezisling Ilows (without Program water), Ihe delivenes ol Program water would not be <br />necessary. <br />t IdenUfy feasible rtteasures and quantify ihe Program water necessery to ensure a yield ot <br />8O0 c1s of Program weter al Ihe Overton gepe during the iMgeNon season (May 1 through <br />Seplomber 30). <br />Status of Phase <br />for 800 cfs Target flows <br />ses I and II <br />- Average years; flow achieve(i abuut 14o d,iy>, )t 1;,?1 tiri: ,,;,.• Req'd release: - 343,000 ac-tt (Cases I and II) <br />- Wet years: flow achieved about 105 days of 153 day season <br />• Req'd release: - 280,000 - 293,000 ac-ft (Case I- Case II) <br />- Dry years: Ilow achieved about 120 days of 153 day season <br />• Req'd release: - 580,000 ac-ft (Cases I and I I i <br />- Constraints include: <br />• Case I: Keystone Div, North Platte ramp, Ncnth Piottu c.h?F? 1; <br />• Case II: North Plane choke pomt
The URL can be used to link to this page
Your browser does not support the video tag.