My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FERC Project No. 1417-174
CWCB
>
Water Supply Protection
>
DayForward
>
1001-2000
>
FERC Project No. 1417-174
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:36:55 PM
Creation date
6/1/2009 2:20:26 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8461.350
Description
Legislation
State
CO
Basin
South Platte
Water Division
1
Date
2/21/2006
Author
FERC
Title
FERC Project No. 1417-174
Water Supply Pro - Doc Type
Legislation
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, Project No. 1417-174 - 3 - <br />Commission, ATT'N: OEP/DHAC. The third set shall be filed with the Commission's <br />Division of Dam Safety and inspecrions Chicago Regional Office. <br />b) The licensee shall file two separate sets of exhibit drawing in eleclronic raster <br />fonnat with the Secretary of the Commission, ATTN: OEP/DHAC. A third set shall Ue <br />filed with the Commission's Division of Dam Safety and Inspections Chicago Regional <br />Office. Exhibit F drawings must be identified as (CEII) material under 18 CFR <br />§388.113(c). Each drawing must be a separate electronic file, and the file name shall <br />include: FERC Project-Drawing Number, FERC Exhibit, Drawing Tide, date of this <br />order, and file extension in the following format [P-1417-1318, F-26, MM-DD- <br />YYYY.TIF]. Electronic drawings shall meet the following format specification: <br />IMAGERY - black & white raster file <br />FII.E TYPE - Tagged Image File Format, (1'IFF) CCITT Group 4 <br />RESOLUTION - 300 dpi desired, (200 dpi nun) <br />DRAWING S1ZE FORMAT - 24" X 36" (min), 28" X 40" (max) <br />FILE SIZE - less than 1 MB desired <br />(C) This order constitutes final agency acrion. Requests for rehearing by the <br />Commission may be filed within 30 days of the date of issuanr,e of this order, pursuant to <br />18 C.F.R. § 385.713. <br />Mohama ayyad <br />Engineering Team Lead <br />Division of Hydropower Administration <br />and Compliance <br /> ? <br />n Q <br />? <br /> O <br /> a <br /> <br /> <br />? O <br />h- <br />4 <br />!,?, ? <br />? <br />?? , <br />? <br />? <br />r ? <br /> <br />N <br />o <br />? <br />?J . U <br />,?``U. W A <br />????QG 4 i% o <br /> CO <br />0 <br />aN?o <br />Z <br /> <br /> ?O? i d <br /> UU?'r'0 <br />to <br />)a I <br />j ?w ? <br />Z ?y <br />V ? t <br />i0 <br />LL <br />11 <br />i!' <br />0 <br />U <br />? <br />4+? <br />? <br />? <br />F <br />id <br />i? <br />* <br />? <br />? <br />? <br />0 <br />00
The URL can be used to link to this page
Your browser does not support the video tag.