Laserfiche WebLink
1 14 FLhL i( 62, 17 2 <br />UNITED STATES OF AMERICA <br />FEDERAL ENERGY REGULATORY COMMISSION <br />Central Nebraska Public Power and irrigation District Project No. 1417-174 <br />ORDER APPROVING AS-BUILT EXHIBIT F DRAWINGS <br />(Issued February 21, 2006) <br />On January 27, 2006, Upper Central Nebraska Public Power and Irrigation District <br />(Central), licensee for the Kingsley Dam Project, FERC No. 1417, filed as-Uuilt Exhibit F <br />drawings reflecring the construction of new gates at the Central Diversion Dam of the.. <br />project. The project is located on the North Platte and P(atte Rivers in Nebraska. <br />BACKGROUND <br />The Central Diversion Dam, a part of the Kinsley Dam Project, is located 50 miles <br />of the Kingsley Dam, just below the confluence of the North and South Platte Rivers, <br />diverts Platte River flows into Central's 75-mile long Supply Canal. In the fall 2005, <br />Central installed newly constructed Diversion Dam gates 45 and 98. The design <br />modifications to gates were minor and were permitted without prior approval from the <br />Commission under Article 3 of Form L-3 of the new license. ' <br />REVIEW <br />Central filed one revised and two new exhibit F drawings. The revised eachibit F <br />drawing show references to the two new drawings that show changes to gates #5 and #S. <br />The euhibit drawings adequately show project structures that were modified, and confoim <br />to the Commission's rules and regulations, and are approved by this order. <br />The D'uector orders: <br />(A) The following exhibit drawings, filed on January 27, 2006, are approved <br />and made part of the license. <br />' 84 FERC &61,079 Order Issuing New License, July 29, 1998. <br />Project No. 1417-174 <br />-2- <br />ExNibit ?RC Title Superseded <br /> No. Drawing No. <br /> Upper Diversion Dam <br />F-26 1417-1318 1417-1026 <br /> Detail of Skimmer Gates <br /> Upper Diversion Dam <br />F-26A 1417-1319 . <br /> Detail of Skimmer Gates No. 5& 8 <br /> Upper Diversion Dam <br />F-26B 1417-1320 <br /> Detail of Skimmer Gate Stems No. 5& 8 <br />The superseded drawing 1417-1026 is eluninated from the license. <br />(B) Within 45 days of the date of issuance of this order, the licensee shall file <br />the approved exhibit drawing in aperiure card and electronic file formats. <br />a) Three sets of the approved exhibit drawing shall be reproduced on silver or <br />gelatin 35mm microfilm. All microfilm shall be mounted on type D(3-1/4" X 7-3/8") <br />aperture cards. Prior to microfilming, the FERC Project-Drawing Number (i.e., <br />P-1417-1318) shall be shown in the margin below the title block of the approved <br />drawing. After mounting, the FERC Drawing Number shall be typed on the upper right <br />corner of each aperture cazd. Addirionally, the Project Number, FERC Exhibit (i.e., F- <br />26), Drawing Title, and date of this order shall be typed on the upper left corner of each <br />aperture card. See Figure 1. <br />e'ERC Drawing <br />G-1, ProJeet Boundary FERC D-Q 1234-01 <br />\ <br />order iseuanca <br />aata <br />Eachibit A atad 8'ERC D-inq k . <br />Tasrie n I'ii/ .. Y'f'/ .11 arm.-t.- -A <br />Figure 1 Sample Aperture Card Format <br />Two of the sets of apernue cazds shall be filed with the Secretary of the