Laserfiche WebLink
4 <br />communication there will be one identified representative; however, this does not <br />preclude each entity from having additional participation on the Oversight Committee. <br />Participation from the _ Governance Committee will be appointed by the Governance <br />Committee. To achieve the development and enhancement objectives, this committee <br />will convene at intervals sufficient to insure timely implementation of the developments <br />and enhancements of the Property. As per Article 407, concurrence from the FWS, <br />NGPC and NPPD Oversight Committee members will be required on all recommended <br />measures before implementation. - - - <br />The Oversight Committee may seek the outside expertise, at their own expense; to aid in <br />the development and enhancement of the Property. All costs associated with meetings of <br />this committee will not be charged against the $1.3 million (1997 dollars) obligation of <br />NPPD. Attendance at all Oyersight Committee meetings will be voluntary and without <br />compensation. NPPD will draft all written documents and meeting minutes, make <br />meeting arrangements and handle other logistics of the Oversight Committee. <br />The Oversight Committee will prioritize measures and determine if all baseline and <br />engineering data necessary for achieving the development and enhancement objectives <br />are available prior to implementing the phases set out in this Plan. If adequate <br />information is not available, NPPD will consult with the Oversight Committee to <br />determine if the needed information exists or can be obtained from other sources. <br />Development and enhancement - methodologies will be completed by the Oversight <br />Committee to achieve the phases described in Section 4. <br />These development and enhancement methodologies will include: measurable objectives <br />of the development or enhancement measures, costs, methods, data needs, monitoring and <br />evaluation needs, level of impacts, specific dates for initiation and completion, and any <br />other relevant information (Exhibit B). The development and enhancement <br />methodologies will outline how to achieve development and enhancement objectives, <br />timelines to allow NPPD to establish budgets, and also allow the Governance Committee <br />time to establish monitoring and evaluation methodologies to facilitate the adaptive <br />management concept of the Proposed Program. The development and enhancement <br />methodologies will identify any permits needed to do the work and allow sufficient time <br />to obtain those permits. <br />3.0 Development and Enhancement Objectives <br />3.1 Documentation of Physical Setting <br />Objective: Document the physical setting of the Property required to implement <br />development and enhancement measures. <br />Conduct surveys of topography, groundwater, cultural resources, unique areas or any <br />other aspects of the physical make up of the Property necessary to develop and enhance <br />the Cottonwood Ranch Property for whooping cranes, least terns and piping plovers. <br />Surveys will also address possible impacts, both positive and negative, from