My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arkansas - UAWCD Telemetry Data Collection_Notice to Proceed & Contract
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Arkansas - UAWCD Telemetry Data Collection_Notice to Proceed & Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/10/2012 8:32:22 AM
Creation date
5/14/2009 1:58:45 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Arkansas
Applicant
Upper Arkansas Water Conservancy District
Description
Telemetry Data Collection Platforms at Six Reservoirs plus Flow Control Equipment and Gauging at Six
Account Source
Basin & Statewide
Board Meeting Date
9/17/2008
Contract/PO #
150439
WSRA - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Performance measures were developed for BOR and will be submitted to both BOR and CWCB <br />simultaneously at the end of the 24 month project. Actual benefits will be derived by comparing pre-project <br />data with post-project data. Both pre- and post-project measurements will be derived from: <br />• Frequency and accuracy of data on reservoir water levels and releases, and <br />• Employee time spent on reservoir monitoring and water control. <br />Payment: Payment will be made based on actual expenditures and invoicing by the water activity sponsor. <br />The request for payment must include a description of the work accomplished by major task, and estimate <br />of the percent completion for individual tasks and the entire water activity in relation to the percentage of <br />budget spent, identification of any major issues and proposed or implemented corrective actions. The last <br />5 percent of the State-funded portion of the water activity budget will be withheld until final project/water <br />activity documentation is completed. <br />All products, data and information developed as a result of this grant must be provided to CWCB in hard <br />copy and electronic format as part of the project documentation. <br />Section 2: Key Personnel <br />The project team described in Table 6 was vetted and selected as part of the BOR Water 2025 Challenge <br />Grant. <br />Table 8: PART{CIPANT QUALIFICATIONS <br />PaRici nt Qualificatans Role <br />Terry Scanga, B.A. Economics; 33 years experience in business Prinapal-at-Large <br />UAWCD Man er administration 8 man ement; district mono er since 2001 <br />Ivan Walter, UAWCD <br />Consulting District M.S. Agricultural Irrigation Engineering; PE 26115 (CO); 30 <br />Planning, Oversight <br /> years experience anatysis of river and stream basins <br />E ineer <br />Jord Gerfson, B.S. Watershed Saence; 10+ years experience planning Design, Instrumentation <br />UAWCD Consulting and implementing field investigations; President, Installation, Oversght <br />H drd ist SourceWater Cansultin since 2000 <br />Chris Manes, B.S. Civil Engineering, PE (CO);1999 award Professional Design, <br />UAWCD o(Yearby CO Division of Water, owner Colorado River Oversight <br />Consultin En inset En ineerin since 1998 <br />Steve Dahmer, <br />UAWCD M.S. Fisheries & Wildlife Biology; l5 years experience with NEPA Consultation <br />Environmental USFS, BLM, USCOE; owner Environmental Sdutions <br />Consultant <br />Marcus Lock, <br />Julianne Woldridge, .UAWCD Lawyers: Outside Counal; J.D.s /various Permitting <br />John Hill <br />Patriaa J. Burrgert, <br />UAWCD Consulting M.S. Forest Resources; wrote and wonlmenaged Federal Finanaal and Performance <br /> <br />Grant Man er and State grants totaling $10 million Reporting <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.