Laserfiche WebLink
Table 1. ANTICIPATED FUNDING SOURCES <br />Or anaation Amount Percents e <br />Upper Arkansas Water Conservancy District -$144,356 18% <br />Regional Resource Planning Group Cost Share -$100,000 12% <br />Bureau of Reclamation Water 2025 Challenge Grant -$285,322 35% <br />CWCB Water Supply Reserve Account -$285,322 35% <br />TOTALS -$815,000 100% <br />Task A: Data collection platforms at six reservoirs <br />Description: Task A involves installing telemetry data collection platforms at six reservoirs to accurately <br />acquire water and weather data. The reservoirs and their locations are listed in Table 2 below. <br />Table 2: RESERVOIR DATA COLLECTION PLATFORM SITES <br /> Name ElevationlLocation <br /> 400; headwaters of the North Fork of the South <br />11 <br />1 North Fork Reservoir , <br />Arkansas River <br /> 9,560 feet; Cottonwood Creek, <br />2 Cottonwood Lake west of Buena Vista <br /> ' 200 feet headwaters of Poncha Creek above South <br />9 <br />3 Haver Reservoir <br />O . <br />Arkansas River <br /> 7,700 feet, Grape Creek (principal tributary), Custer <br />4 DeWeese Reservor Coun <br /> 870 feet; headwaters of the <br />11 <br />5 Boss Lake Reservor , <br />South Arkansas River <br />6 Rainbow Lake 9.230 feet Cottonwood Creek, <br /> west of Buena Vsta <br />Data collection platforms use wireless telemetry to remotely monitor reservoir water and weather conditions <br />with equipment that logs data every 15 minutes and transmits it to a designated National Oceanic and <br />Atmospheric Administration (NOAA) website. The Campbell Scientific instrumentation equipment will <br />measure: (1) reservoir level, (2) outlet flow, (3) weather (wind speed, precipitation, barometric pressure, air <br />temperature and humidity) and (4) precipitation using a tipping bucket. Telemetry stations allow for future <br />Supervisory Control and Data Acquisition system expansion such as raising and lowering head gates. <br />Table 3 summarizes the Task A scope of work, which includes Tasks Al through A7; for cost details see <br />Section 3. <br />TABLE 3: TASK A SCOPE OF WORK SUMMARY <br />Task Description <br />Al Project management and meetings <br />~ Vetting/costing two platform design options (done) <br />A3 Ordering capital equipment <br />A4 Installing water and weather data collection platforms <br />A5 Test run datalogger and sensors <br />A6 Calibrating and reporting initial month data <br />A7 Financial reporting, performance reporting <br />2 <br />