My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150073 Final Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150073 Final Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2010 3:33:07 PM
Creation date
4/23/2009 10:05:54 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150073
Contractor Name
Southeastern Colorado Water Conservancy District - Water Activity Enterprise
Contract Type
Grant
Water District
14
County
Pueblo
Bill Number
SB 01-157
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Feasibility Evaluation of the Arkansas Valley Pipeline <br />Water Works! Committee <br />June 2003 <br />(excluding areas outside of the SECWCD) is estimated to be about 3.4 mgd (3,820 ac-ft/yr) <br />in the year 2020. <br />Community or Water System Current Year 2020 <br />Prowers County mgd Ac-Ft/Yr mgd Ac-Ft/Yr <br />Lamar 2.70 3,025 2.80 3,137 <br />Wiley 0.07 78 0.10 112 <br />May Valley Water Association 0.28 310 0.35 392 <br />Other County 0.05 56 0.16 179 <br /> 3.10 3,469 3.41 3,820 <br />3.1.3.6 Kiowa County <br />Kiowa County is the least populated area of the Lower Valley, and the only entity within the <br />SECWCD is the Town of Eads. Population in 2020 is projected to be 880 persons with water <br />demand of 0.19 mgd (214 ac-ft/yr), based on the Water Needs Assessment. A spur pipeline <br />from the Valley Pipeline to Eads was part of the original USBR Fryingpan-Arkansas Project. <br />3.1.4 Water Demand Summary <br />The total water demand estimates for the project area are summarized in Table 3.3. The total <br />estimated demand used for pipeline sizing, analysis of water rights, and preparation of <br />project cost estimates is 18,200 ac-ft per year. <br />TABLE 3.3 <br />SUMMARY OF WATER DEMAND ESTIMATES <br />County Estimated Year 2020 Demand <br />acre-feet/ ear <br />Pueblo 4,100 <br />Otero 6,809 <br />Crowle 1,510 <br />Bent 1,750 <br />Prowers 3,820 <br />Kiowa 214 <br />Total 18,203 <br />14 <br />GEI Consultants, IIIC. 01284 03-0630 Feas~Diliry EvaWation Final <br />
The URL can be used to link to this page
Your browser does not support the video tag.