Laserfiche WebLink
Feasibility Evaluation of the Arkansas Valley Pipeline <br />W ater Works! Committee <br />June 2003 <br />Town of Sugar City -Has its own independent water sources and distribution system. <br />Estimates of current and future populations within Crowley County were derived from the <br />Water Needs Assessment, data supplies by towns in the county relative to current water <br />system connections, and State demographic projections. <br />Community or Water System <br />Crowley County <br />Current <br />Year 2020 <br />Town of Olney Springs 510 510 <br />Town of Crowley 290 350 <br />Town of Ordway 1,000 1,000 <br />Sugar City 590 610 <br />Other Crowley County 4,100 7,200 <br />Total 6,490 9,670 <br />Notes: <br />1. Receives water from Crowley County. <br />2. Includes populations in prisons at Olney Springs and Crowley. <br />Water demand estimates were obtained from responses to the survey and from the Water <br />Needs Assessment. Results are summarized below: <br />Community or Water System Current Year 2020 <br />Crowley County mgd Ac-Ft/Yr mgd Ac-Ft/Yr <br />Town of Olney Springs .07 78 .07 78 <br />Town of Crowley (.03) (35) (.04) (41) <br />Town of Ordway (.09) (101) (.09) (101) <br />Sugar City .10 106 .11 118 <br />Crowley County .770 862 1.30 1,456 <br />Total 0.82 910 1.35 1,510 <br />Notes: <br />1. Included in CC demand figures. <br />2. Includes service to prisons located in Olney Springs and Crowley, and to CCWA. <br />3.1.3.4 Bent County <br />Water providers in Bent County include the City of Las Animas, the Towns of Ft. Lyon, <br />Hasty, and Caddoa, the Bents Fort Water Association, and the McClave Water Association. <br />Population estimates were derived largely from the Water Needs Assessment. <br />12 <br />GEI Consultants, InC. 01284 03-06-30 Feasibility Evaluation Final <br />