Laserfiche WebLink
Feasibility Evaluation of the Arkansas Valley Pipeline <br />Water Works! Committee <br />June 2003 <br />2.4 Work Products <br />Work products that are required for submittal as part of the scope of work include: <br />1. Technical Memoranda for estimation of water demands, evaluation of available water <br />rights, evaluation of potential pipeline alignments, and financial and economic <br />analyses of the project. <br />2. Phase 1 Report. <br />3. Aerial photography and topographic mapping of pipeline alignments. <br />4. Feasibility-level designs of the pipeline and ancillary facilities. <br />5. Feasibility Report. <br />GEI Consultants, IT1C. 01284 03-06-30 Feasibility Evaluation Final <br />