My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150256 Contract
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150256 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:49:28 AM
Creation date
4/13/2009 9:23:22 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150256
Contractor Name
Bijou Irrigation District
Contract Type
Loan
Water District
1
County
Morgan
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Summary - Bijou Irrigation District - Contract No, C150256 <br />SECTION 1 -BORROWER INFORMATION <br />Name: Bijou Irrigation District <br />Address: P.O. Box 972, Fort Morgan, CO 80701 <br />Contact: Denice Wagner, Secretary <br />Phone Number: (970) 867-2222 Fax Number: (970) 867-2294 <br />E-mail address: office@bijouirrigation.com <br />Type of Entity: a Colorado Irrigation District organized under the Irrigation <br />District Law of 1905 (C.R.S. 37-41-101 to -160) <br />Section 2 - Project Description <br />A. Description of PRO~ECT: The BoRROwER applied to the CWCB for a loan to be <br />used for the rehabilitation of the Empire Intake Canal diversion structure, located <br />on the South Platte River, hereinafter referred to as the PRO~ECr, at an estimated <br />total cost of $720,000. <br />B. Description of Feasibility Study: The CWCB has reviewed a feasibility study report <br />on the PRO~ECT entitled "Feasibility Study of the Rehabilitation of the Bijou Irrigation <br />District Diversion Structure", dated June 2007, compiled by Nation Engineering <br />Services, LLC, which is incorporated herein by reference, and, based upon the <br />feasibility report, the CWCB determined the PROJECT to be technically and <br />financially feasible. <br />SECTION 3 - CWCB'S AUTHORI7Y <br />Severance Tax Trust Fund Perpetual Base Account: This loan is made pursuant to <br />the provisions of §§ 39-29-109(1)(a)(I), 37-60-119 and 37-60-120, C.R.S., which <br />authorize the CWCB to loan money for water projects from the CWCB Severance Tax <br />Trust Fund Perpetual Base Account for the benefit of the people of the state, provided <br />that the borrower assures repayment of that money. <br />Section 37-60-122(1)(b) C.R.S., authorizes the CWCB to make loans of up to <br />$10,000,000 from the CWCB's Construction Fund and the State Severance Tax Trust <br />Fund Perpetual Base Account Fund without prior approval from the General Assembly <br />SECTION 4- BOARD APPROVAL AND LEGISLATIVE AUTHORIZATION (IF NEEDED~ <br />At its September 2007 meeting, the CWCB approved a loan from the Severance Tax Trust <br />Fund Perpetual Base Account to the BoRROwER in an amount up to $654,480 fOC PROJECT <br />costs, not to exceed 90% of the cost of the PRO~ECr, with a loan origination fee of 1% in <br />accordance with CWCB Policy No. 16, at an interest rate of 2.25% per annum for a <br />repayment term of 30 years. <br />SECTION 5- SCHEDULE OF EXISTING DEBT <br />The Borrower has two existing loans with the CWCB: 1) Loan Contract C150199, dated <br />September 8, 2006 and amended August 20, 2007, in the amount of $723,950 at an <br />Appendix 1 to Loan Contract C150256 <br />Page 1 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.