Laserfiche WebLink
THE PARTIES HERETO HAVE EXECUTED THIS CONTRACT <br />BORROWER: Bijou Irrigation District, <br />organized under the Irrigation District <br />Law of 1905 (C.R.S. 37-41-101 to -160) <br />By <br />Donald Neb, President <br />--•~SEAL) <br />-- <br />c~ `'"'' .~''T. ~ ~ <br />~~ ~~ <br />~.tte ,, <br />~ <br />< <br />c <br />By ~, <br />Denice Wagner, ecretary <br />State of Colorado <br />Bill Ritter, Jr., Governor <br />gy .~~~P~ <br />For the Executive Director <br />Department of Natural Resources <br />Colorado Water Conservation Board <br />Jenni#er L. Gimbel, Director <br />Pre-Approved Form <br />r <br />By V <br />WCB ontra t Manager <br />ALL CONTRACTS MUST BE APPROVED BY THE STATE CONTROLLER <br />CRS 24-30-202 requires that the State Controller approve all state contracts. This <br />contract is not valid until the State Controller, or such assistant as he may <br />delegate, has signed it. The contractor is not authorized to begin performance <br />until the contract is signed and dated below. If performance begins prior to the <br />date below, the State of Colorado may not be obligated to pay for the goods and/or <br />services provided. <br />Leslie M. Shenefelt, State Controller <br />gy ~ <br />~ <br />Effective Date il--~~-CJ~ <br />LOAN CONTRACT No. C150256 <br />Page 11 of 11 <br />