My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CRWCD Decree For Elkhead Enlargement
CWCB
>
Instream Flow Acquisitions
>
DayForward
>
CRWCD Decree For Elkhead Enlargement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2020 1:06:08 PM
Creation date
2/26/2009 4:57:04 PM
Metadata
Fields
Template:
Instream Flow Acquisitions
Case Number
02CW0106
Stream Name
Yampa River
Watershed
Yampa
Water Division
6
County
Routt
Instream Flow Acq - Doc Type
Final Decree/Stipulations
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Dislrid CourE, Water Division 6, Colorado <br />Case Into. o2CWId6; Application of: Colorado River Water Conservation District and its Colorado River Water <br />Projects Enterprise, in Routt and Moffat Counties, Colorado <br />Decree of the Water Court <br />Paga 6 of 7 <br />appropriation. <br />7. se: The- water will be used for hydro-power production at the <br />Ellchead Creek Reservoir facility. <br />8. C~ and WiII: The Court Ends that the claimed conditional direct <br />Ilow power right can and will be diverted, stored, captured, <br />possessed and controlled and will be beneficially used for the <br />claimed purposes, and the River District's hydro-electric power <br />project can and willbe completed with diligence withinareasonable <br />time. <br />9. No Injury: The Court finds that no injury to vested water rights will <br />occur by the exercise of the conditional direct ~Iow power right. <br />I4. Xntegrated Wat~SupRiy and Distribution Sv, std: The conditional <br />Elkhead Creek Reservoir Enlargement {second) storage right, the <br />conditional direct flow power right, and the existing Elkhead Creek <br />Reservov constitute an integrated water supply and distribution <br />system with respect to the Applicant's water rights ax #his resersroir. <br />7. GrrarltingQft e,pplication: The Application should be and hereby is granted and-decreed <br />and the water rights -for the Ellchead Creek Reservoir Enlargement {second) and the <br />Elkhead Creck Reservoir Enlargement Power Right are confirn~ed in accordance with <br />pacagtaphs 6{B) and 6{fi) of this decree. The water storage rightconfirmed by-than decree <br />sE~all be operated in a manner consistent with and subject to the terms of the Amended and <br />Restated Agreement-between Applicant, the City of Craig, and the Yampa Participants <br />dated January 2 I, 2Q05, which Agreement is hereby incorporated herein by -reference and <br />made a part of this Decree, as it may be amended or supplemented from-time to time. <br />8. ~u~er Diligence; An application for a f nding of reasonable diligence shall be filed in the <br />same month and six years after the entry of the final decree in this case in order tv maintain <br />the conditional water storage right and- the conditional direct flow power right unless a <br />decree making the rights absolute has been entered by the Court before that date. <br />
The URL can be used to link to this page
Your browser does not support the video tag.