Laserfiche WebLink
i <br />District Court, Wxta~ Division 6, Colorado <br />Case No. 4ZCWI06; AppIicat~ of: Colorado River Water C'aasavation District ar~d its Cdoratlo River Walla <br />Fmjects Enterprise, in Routt and Moffat Counties, Colorado <br />Decree of ~e Water Court <br />Page S of? <br />l2. No 'n :The Court finds that no injurq to vested water rights will <br />occur by the exercise of the claimed wafer storage right. <br />13. Iateg`ra~ Water Supply and Distrl 'on $vste~n: The conditional <br />EIkhead Reservoir Enlargement {second} storage rig~it, the <br />conditional direct flow power right, and the existing Elkhead C~eelc <br />Reservoir constitute an integrated water supply and distn'bution <br />system with respect to the Applicant's water rights at this reservoir. <br />C. Conditional Direct Flow Waxer Right: <br />- - <br />1. ~auxe,_ of tie ~t~cture: lrhe structure is Elkhead Creek R~voir <br />Enlargement Power Right. <br />2. Description of the Point of Diver~on: The pourt of diversion <br />will be at the darn of the Elkhead Creek Reservoir Enlargement; <br />located approximately where the South quarter of Section 1 b, <br />Township 7 North, Range $9 West of the fie P.M. bears South <br />34°4T l3" East, 869.37 feet. A point on the dam is located 374 feet <br />North of the South line and 1637 fee# East of the West line of said <br />Section i6. <br />3. Source: The source of the water is Elkhead Creek and its tributaries; <br />tn`butary to the Yampa River. <br />4. ~,rriount: The amount is 244 c.fs., conditional. <br />5. Date o~Alspropriatign: The date of the elation is October 16, <br />2042. <br />6. Initiation ofAgpro~-riation: The conditional direct flow power right <br />was initiated by the River District forming the intent tv appropriate <br />water as evidenced by the River District's formal resolution, <br />pi$cbase of real property, recordation of deeds, filing of surveys, <br />participation in public meetings and other acts in furtherance of the <br />