Laserfiche WebLink
TABLE 3 <br />CACTUS PARK DAM AND RESERVOIR PROJECT <br />FINANCING OPTIONS <br /> Annual <br /> Construction Interest Period Annual Cost per <br />Option Cost Estimate Rate (years) Cost Acre- Foot <br />1 $40,837,000 4.0% 30 $2,361,608 $209 <br />2 $40,837, 000 4.0% 40 $2,063,228 $183 <br />3 $40,837,000 3.5% 40 $1,912,286 $169 <br />4 $40,837,000 3.0% 40 $1,766,706 $156 <br />5 $40,837,000 2.0% 40 $1,492,827 $132 <br />6 $40,837,000 1.0% 40 $1,243,715 $110 <br />7 $40,837,000 0.0% 40 $1,020,925 $90 <br />Volume of Reservoir Yield in Acre-Feet: 11300 <br />9 <br />