My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153644 Final Report
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C153644 Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 11:07:08 AM
Creation date
2/23/2009 2:53:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153644
Contractor Name
Harris Water Engineeering Company
Contract Type
Grant
Water District
0
County
Statewide
Bill Number
HB 93-1273
Loan Projects - Doc Type
Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 2 <br />CACTUS PARK DAM AND RESERVOIR PROJECT <br />CONSTRUCTION COST ESTIMATE <br />PRC Report <br />Cost Item Cost Estimate <br />Cactus Park Dam (PRC Report) $19,922,000 <br />Surface Creek Feeder Canal (PRC Report) $8,494,000 <br />Cedaredge Canal (PRC Report) $7,094,000 <br />PRC Report Subtotal $35,510,000 <br />Index from 1986 to 1993 (15%) $5,327,000 <br />TOTAL ESTIMATED CONSTRUCTION COST $40,837,000 <br />Cost per Acre-Foot of Reservoir Yield $3,fi10 <br />Reservoir Yield in Acre-Feet 11300 <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.