My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153644 Final Report
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C153644 Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 11:07:08 AM
Creation date
2/23/2009 2:53:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153644
Contractor Name
Harris Water Engineeering Company
Contract Type
Grant
Water District
0
County
Statewide
Bill Number
HB 93-1273
Loan Projects - Doc Type
Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE 3 <br />BOOTLEG DAM AND RESERVOIR <br />ESTIMATED CONSTRUCTION COST <br />Item Units Quantity $/Unit Cost <br />Corp of Engineers Estimate -Table 2 $2,279,000 <br />Additional Items <br />Rip Rap cy 17780 $20.00 $356,000 <br />Canal Relocation Is $10,000 <br />Embankment Subtotal $366,000 <br />Total Field Cost $2,645,000 <br />Engineering & Admin (15%) $396,800 <br />Land Cost (90 acres) $45,000 <br />TOTAL ESTIMATED CONSTRUCTION COST $3,087,000 <br />Construction Cost per Acre-Foot of Storage $2,060 <br />Reservoir Storage Volume in Acre- Feet 1500 <br />~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.