My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153644 Final Report
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C153644 Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 11:07:08 AM
Creation date
2/23/2009 2:53:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153644
Contractor Name
Harris Water Engineeering Company
Contract Type
Grant
Water District
0
County
Statewide
Bill Number
HB 93-1273
Loan Projects - Doc Type
Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Table 2 <br /> BooReg Dam and Reservoir <br /> Corp of Engineers - 1990 Cost Estimate <br />1. QMISSIONS. This cost estimate does not include the items of instrumenta- <br />tion, land acquisition, stone protection, or relocation of the Denver-Hudson <br />Canal. <br />~~ QUAP7TITY UNIT UNIT COST TOTAL COST <br /> <br />Dam <br />Clear ~ Grub 4 Acre 650.00 $ 2,600 <br />Embankment 184,500 C.Y. 0.51 94,095 <br />Stripping/Topsoil 9,400 C.Y. 1.71 16,074 <br />Concrete Removal 7,800 S.Y. 6.56 51,168 <br />Care of Water L.S. 4,184 <br />Seeding 11.5 Acre 1,109.00 12,754 <br />Gravel Surfacing 930 C.Y. 20.00 18,600 <br />Spillway <br />Excavation 184,500 C.Y. 1.56 287,820 <br />Embankment/Beret 4,000 C.Y. 1.27 5,080 <br />Riprap 3,400 Tons 21.63 73,542 <br />Bedding 1,000 Tons 12.64 12,640 <br />Soil Cement 2,400 C.Y. 60.00 144,000 <br />Seeding 80 Acre 1,193.00 95,440 <br />Waste 527,500 C.Y. 1.33 701,575 <br />Outlet Works <br />Excavation/Backfill 11,100 C.Y. 7.23 80,253 <br />Slide Gate L.S. 30,000.00 30,000 <br />48" Diameter RCP 150 L.F. 290.71 43,607 <br />Flared Inlet L.S. 900.00 900 <br />Stilling Basin L.S. 77,359.00 77,359 <br />Demolition L.S. 12,647.00 12.647 <br /> TOTAL $1,764,338 <br /> 30~ CONTINGENCY 514.910 <br /> TOTAL CONSTRUCTION COST $2,279,248 <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.