My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153644 Final Report
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C153644 Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2010 11:07:08 AM
Creation date
2/23/2009 2:53:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153644
Contractor Name
Harris Water Engineeering Company
Contract Type
Grant
Water District
0
County
Statewide
Bill Number
HB 93-1273
Loan Projects - Doc Type
Report
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
382
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
There is rock in and around the reservoir basin which is expected <br />to usable for rip rap. The rock is very hard but may not be the <br />best sizes for rip rap which may require a thicker layer than the <br />estimated 2 feet. <br />There is also an auxiliary dam which wilt be evaluated during the <br />plans and specification phase. The cost of any repairs are minor <br />compared to the main embankment but should be addressed in detailed <br />studies. <br />OUTLET PIPE: The outlet pipe size is suggested to be 24 inch <br />diameter which is significantly larger than the size required by <br />the Rules and Regulations but provides easier operation and <br />maintenance and if a liner is needed in 50 years or so, it can be <br />installed without impacting the ability to drain the top 5 feet of <br />the reservoir in 5 days. The pipe material should be thick walled <br />steel, possibly lined or encased with mortar or concrete; CMP is <br />not recommended. During the design process, the necessity for a <br />concrete bed for the pipe or encasing the pipe in concrete should <br />be investigated. <br />SPILLWAY: The spillway will be sized to pass one half the PMP. <br />The existing spillway width is expected to be adequate but can be <br />easily widened if necessary. The spillway channel is presently in <br />rock and no additional rip rap is expected to be required. <br />Big Battlement Dam 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.