Laserfiche WebLink
TABLE 6 <br />BEAR CREEK DAM AND RESERVOIR <br />ESTIMATED CONSTRUCTION COST <br />Item Units Quantity $/Unit Cost <br />---------------- --- ----- ----- ------ <br />--------------- --- ----------- ------ <br />Mobilization Is $20,000 <br />Embankment <br />Compacted Fill <br />Rip Rap <br />Toe Drain <br />Outlet Works <br />Outlet Pipe, 36 inch <br />Gate and Controls <br />S illwa <br />Excavation <br />Concrete Control Section <br />cy 542500 $4.00 $2,170,000 <br />cy 6220 $20.00 $124,400 <br />ff 500 $25.00 $12,500 <br />Embankment Subtotal $2,306,900 <br />If 550 $300 $165, 000 <br />Is $15,000 <br />Outlet Works Subtotal $180,000 <br />cy 66670 $2.00 $133, 300 <br />cy 20 $300.00 $6,000 <br />Spillway Subtotal $139,300 <br />Total of Above Items <br />Contingency (30%) <br />Land Cost (40 acres) <br />Field Cost Subtotal <br />Engineering & Admin (15%) <br />TOTAL ESTIMATED CONSTRUCTION COST <br />Construction Cost per Acre-Foot of Storage <br />Reservoir Storage in Acre-Feet <br />$2,626,200 <br />$787, 900 <br />$40,000 <br />$3,454,100 <br />$518,100 <br />$3,970,000 <br />$2,650 <br />1500 <br />19 <br />