My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02306
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJC02306
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:18:11 AM
Creation date
2/17/2009 10:42:14 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150280
Contractor Name
Park Center Water District
Contract Type
Loan
Water District
0
County
Fremont
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Preliminary Implementation Schedule <br />December 28, 2009 Permits obtained from State of Colorado by Bureau of <br />Management <br />January 1, 2008 Engineered drawings, if needed, completed. <br />Rights of Way obtained from Bureau of Land Management <br />January 4, 2009 Project is put out for bids <br />February 4, 2009 Bid opening and awarding of contract <br />February 6, 2009 Excavator clears debris and brush off a parcel of land to be <br />used as a 150" x 200" drilling pad, as per attached <br />drawing. Discharge/disposal location for drilling cuttings <br />will be established on site. <br />February 6, 2009 Down payment (10%) paid to drilling company by Park <br />Center. <br />February 15, 2009 Equipment begins mobilization to the site. <br />February 22, 2009 Drilling begins, 200 feet or less from existing well. <br />March 1, 2009 Funds available from CWCB <br />March 15, 2008 Progress billing paid to drilling company when project is <br />50% complete <br />March 26, 2009 Drilling completed. New well casing is cemented. <br />Demobilization begins. <br />March 30, 2009 Final payment made to drilling company, minus 3% <br />retention for 30 days. <br />Impacts <br />Because we are virtually using the same site as the old well, the project should have no <br />impact on local and/or regional plans, land use, economic development, or any other <br />social or economic or environmental effects. <br />