Laserfiche WebLink
8h. Exclusion from De Minimis Rule. <br />The Board may at any time exclude any stream reach or lake, or any portion thereof, from application of <br />the De Minimis rule. <br />8i. Pretrial Resolution. <br />Staff may negotiate a pretrial resolution of any injury or interference issue that is the subject of a <br />Statement of Opposition. The Board shall review the pretrial resolution pursuant to the following <br />procedures: <br />(1) No Injury. <br />In the event the pretrial resolution includes terms and conditions preventing injury or interference and <br />does not involve a modification, or acceptance of injury or interference with mitigation, the Board is not <br />required to review and ratify the pretrial resolution. Staff may authorize its counsel to sign any court <br />documents necessary to finalize this type of pretrial resolution without Board ratification. <br />{2) No Injury/Modification. <br />In the event the pretrial resolution addresses injury or interference through modification of the existing ISF <br />decree, the process set forth in Rule 9 shall be followed prior to any Board decision to ratify the pretrial <br />resolution. <br />(3) Injury Accepted with Mitigation. <br />In the event a proposed pretrial resolution will allow injury to or interference tivith #~an ISF right, but <br />mitigation offered by the applicant would enable the Board to accept the injury or interference while <br />continuing to preserve or improve the natural environment to a reasonable degree, and if the proposed <br />pretrial resolution does not include a modification under ISF Rule 9, the Board shall: <br />(a) Conduct a preliminary review of the proposed pretrial resolution during any regular or <br />special meeting to determine whether the natural environment could be preserved or <br />improved to a reasonable degree with the proposed injury or interference if applicant <br />provided mitigation: and: <br />(b) At a later regular or special meeting, take final action to ratify, refuse to ratify or ratify with <br />additional conditions. <br />(c) No proposed pretrial resolution considered pursuant to this Rule 8i.(3) may receive <br />preliminary review and final ratification i~at the same Board meeting. <br />_d) The Bard shat[ not enter into any stipulation or agree to any decretal terms and <br />conditions urger this Rine that ~~~ould result in the Division of Vt~ater Resources being <br />unable t^ administer the affected ISF water right(s~~ in accordance with the priority system <br />Lr with Colorado avatar IaE~r. <br />~e' To irtitia~e CIt,~CB staff review of an Injury with Mitigation proposal, the proponent must <br />prCO/ide the fCf!!o.'lrirlq i nformation in writing: <br />i Location of iniury to ISF water right(s) (stream(s) affected, length of affected <br />reacht'es ~: <br />ii Quantification of iniury (amount. timing and frequency); <br />i <br />