My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02291 (2)
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
PROJC02291 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:18:11 AM
Creation date
2/2/2009 11:10:13 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150280
Contractor Name
Park Center Water District
Contract Type
Loan
Water District
0
County
Fremont
Loan Projects - Doc Type
Approval Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Park Center Water District <br />January 20, 2009 -Updated January 27, 2009 <br />Page 4 of 6 <br />Table 1. Financial Summary <br />Agenda Item l la <br />PROJECT/LOAN <br />Total Project Cost $1,500,000 <br />CWCB Loan $1,000,000 <br />CWCB Loan (Includin 1% Service Fee) $1,010,000 <br />CWCB Annual Loan Pa ent $55,000 <br />CWCB Annual Loan Obli ation (Includin 10% Reserve Fundin) $60,500 <br />Current Number of Ta s 1,415 <br />Avera a Monthl Cost Per Ta for Project Before With Project <br /> $28.00 $31.23* <br />*Note: The District plans to set aside cash reserves for the CWCB debt reserve account rather than <br />assess its users the additional amount. <br />Creditworthiness: The District has three existing loans with USDA Rural Development as shown in <br />Table 2. The District is in good standing on all three loans. The collateral on the existing debt is a <br />pledge of assessment revenues, which is the same collateral the CWCB will take; therefore, the CWCB <br />will require a parity agreement from Rural Development as part of the standard contracting process. <br />Table 2. Existing Loans from Rural Development <br />Loan Descri tion Remainin Amount Annual Pa ent Maturit Date <br />District Im rovements $218,000 $20,125 2023 <br />Treatment Plant Construction $629,900 $43,187 2033 <br />Treatment Plant Construction (2) $135,400 $9,260 2034 <br />Even with the Project, the District's monthly rates are within the State average. In the event that the <br />Project runs over budget, the District will pay all additional costs with its cash reserves. <br />
The URL can be used to link to this page
Your browser does not support the video tag.