Laserfiche WebLink
Park Center Water District <br />January 20, 2009 -Updated January 27, 2009 <br />Page 2 of 6 <br />Agenda Item l la <br />2) Prior to signing a contract with the CWCB, the District must obtain written approval of the well <br />drilling Project from the BLM as required in its existing lease document. <br />Staff further recommends the following clause be included in the contract: <br />If the District is successful in obtaining federal assistance through congressional funding or it (in <br />conjunction with the BLM) receives emergency funds for well drilling, it will apply such funds <br />towards repayment of the CWCB loan. <br />Background <br />Park Center Water District is located in Fremont County on the north side of Canon City. The District <br />was formed in 1968 by irrigators of small ranches and farms as a means of supplying residents with <br />drinking water. Prior to the District formation, the residents hauled water to fill cisterns or they took <br />water directly from the ditch, which flowed with the Park CenterlBLM well (well) water. In the 1960s, <br />a water system was constructed to deliver water to area residents. Until 1995, the sole source of this <br />supply was the well. <br />The 3,216 foot deep well was originally drilled as an oil exploration well between 1923 and 1927. The <br />well failed to produce oil or gas; however, a large artesian aquifer was discovered. The BLM purchased <br />the well from the oil company and began selling water to area users in 1937. The well has a 1938 decree <br />for 2.67 cfs and is nontributary. The District has leased this well for forty years and has a first right of <br />refusal to renew the lease when the current lease expires in 2021. The BLM currently charges the <br />District $0.43 per 1,000 gallons of water for municipal and domestic use and $0.23 per 1,000 gallons of <br />water diverted for irrigation use. The BLM has the right to modify the lease at five year intervals for <br />purpose of updating the pricing of water. <br />In the spring of 2008, the well developed a leak allowing water to reach the surface. The BLM had a <br />contractor inspect the well and it was determined that leaks existed from 10 feet to 2,400 feet below the <br />surface. The well leaks are causing water to come up outside of the casing. The District has installed <br />piping to take pressure off of the well and is diverting this water to an irrigation ditch until repairs can be <br />made. <br />In addition to seeking funding through the CWCB, the District is attempting to get federal assistance <br />through congressional funding and/or funds from the BLM for emergency well drilling. If it is <br />successful in obtaining other funding, the CWCB contract will require that those funds be applied <br />towards repayment of the CWCB loan. <br />Loan Feasibility Study <br />The Loan Feasibility Study titled "Feasibility of Drilling a New Well at the Existing Park Center Well, <br />November, 2008" was prepared by Debbie Marsicano, District Manager, with technical support from <br />Roy Smith, Water Rights Specialist, BLM. The study was prepared in accordance with the CWCB <br />guidelines and includes a hydrogeologic report and cost estimates. <br />