Laserfiche WebLink
<br />CWCB Construction Fund Loan Application <br />The ditch company installed approximately 1060 lineal feet of 6' corrugated metal pipe (CMP) <br />to stop the irrigation ditch from leaking and reduce water loss. The joints in the newly installed <br />CMP were leaking, which in turn caused another slide to develop. Additional efforts to seal the <br />joints in the CMP have recently been completed and consist of the installation of leak-proof <br />bands on the interior of each of the pipe joints. The head scarp areas of the failures have been <br />stabilized by the installation of soil nail reinforcing, but the exposed faces still need to be <br />protected from erosion. The ditch company proposes to construct concrete headwalls at the <br />upstream and downstream ends of the CMP to reduce the under seepage and scour occurring at <br />~ the inlet and outlet of the pipe. In addition, the slope debris situated beneath the failures will <br />need to be removed and/or stabilized. The seasonal water flows in the ditch are used to irrigate <br />approximately 4,000 acres of meadows and pastures. <br />Water Right: 75_CFS. Average water diverted per year: _Api mximately Rr(1(l~ acre-feet, <br />6. Will the acquisition of additional water rights be necessary? YES NO ~ <br />If YES, please explain. <br />7. Please list the names and addresses of the Applicants' engineer(s) and attorney(s). <br />NWCC, Inc. P.O. Box 775226, Steamboat Springs, CO 80477 <br />(970) 879-7888 Attn: Brian Len, P.E. <br />~ List any feasibility studies or other investigations that have been completed or are now in progress <br />for the proposed project. Please submit one copy of each completed study with this application. <br />Fact Fnrk T)itch Renairc Feacihility 4t~, y, 41nne Fail it . Fv lna inn nd Stahili~atinn <br />RecnmmendatinnSr Additional Anne Prntectien Recnmmendati~ns, Addi inn 1 Remedial Sln~ <br />Imnmvements & 4nil Nail T.auncher,lnc_ r_ eTnrt. <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />• ~ CFLA902 <br />