My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02275 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC02275 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:44:32 AM
Creation date
2/2/2009 10:42:57 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150166
Contractor Name
East Fork Mutual Irrigation Company
Contract Type
Loan
Water District
50
County
Grand
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />CWCB Construction Fund Loan Application <br />flow of 75 CFS to the properties owned by the shareholders. Water is diverted from the East Fork <br />of the Troublesome Creek. A landslide occurred directly below the subject ditch as a result of the <br />ditch leaking. The ditch company recently installed approximately 1,000 lineal feet of 6' diameter <br />CMP to reduce the leakage in the ditch. However, after the CMP was installed and the ditch was <br />fumed back on the joints in the pipe began to leak and a second landslide developed directly below <br />a leaking joint. The two failed areas located immediately below the ditch were soil nailed to <br />provide stability. However, the failed materials/debris below the slides have not yet been removed <br />or stabilized. The ditch company needs to repair the leaking joints in the CMP and stabilize the <br />• debris below the failed areas and restore the scarps located in the failed areas. <br />For existing facilities indicate: <br />Number of shareholders: 7 or Number of customers served: NA <br />Current Assessment per share: $ * Number of shares: 1000 <br />Number of acres irrigated: 1319 Hay Meadow & 2585 Irrigated Pasture <br />Part B. -Description of the Project <br />1. Name of the project or facility: East Fork Ditch (Haypark Canal) <br />2. Purpose of this loan application. Check one. <br />New project <br />_~ Rehabilitation or replacement of existing facility <br />Enlargement of existing facility <br />Emergency Repair <br />• Other (describe) <br />3. If the project is for rehabilitation of an existing reservoir, is the reservoir currently under a <br />storage restriction order from the State Engineer? YES _ NO ~ <br />4. General location of the project. (Please ,include county and approximate distance and direction <br />from nearest town, as well as legal description, if known. C'rrand C:~Lnty 14 5 miles Northeast <br />~f Kremmli~, NF. '/d, ~W '/4,,Sec FTR79W, T2N <br />5. Please provide a brief narrative description of the proposed project including purpose, need, <br />facilities, type of water uses to be served and service area. Attach separate sheet, if needed. <br />2 CFLA902 <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.