My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Montezuma (2)
CWCB
>
Grants
>
DayForward
>
Montezuma (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 12:17:55 PM
Creation date
1/6/2009 11:43:40 AM
Metadata
Fields
Template:
Grants
Applicant
Anderson Consulting Engineers, Inc.
Grant Type
FEMA
Fiscal Year (i.e. 2008)
2005
Project Name
Montezuma County DFIRM Project
CWCB Section
Watershed & Flood Protection
Contract/PO #
C154035
Grants - Doc Type
Scope of Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• of the effective FEMA stu~ies should be identified, LOMC areas should be identified, and comgnunity <br />requests should be identified. This task also includes populating the streamlines with existing pipeline <br />and scoped studies currently underway. <br />The CWCB will lead the effort to contact and coordinate with the communities and FEMA/NSP will be <br />responsible for e~forts related to existing data collection and the Scoping Tool. <br />Standards: All work under Activity 1 shalt be performed in accordance with ttne standards specified in <br />Sec~ion 5 of this MAS. <br />Deliveribles: FEMA/NSF shall make the following products available to FEMA and the CWCB: <br />• Copies of all digital files obtained anc~ lists of files that may be available at a later date; <br />• A Pre-Scoping Report including all data compiled from the described research; <br />• Summary of the Community's needs; and <br />• Scoping Tool project files. <br />Inform2ition on the Scoping Tool can be downloaded from <br />http://wv,~vv.h~.za°ds.g,ov/r~sourc~s/scopi~ .~ht~n, <br />Activuty 2 - Scoping <br />• Task 2~-1 Project Management Team Participation <br />Respornsible Mapping Partner: CWCB and FEMA/NSP <br />Scope: In cooperation with the FEMA Region, a Project Management Team will be established <br />consisting of the CWCB, FEMA's Regional Engineer, Montezuma County and other appropriate <br />official.s. 'The Project Management Team will be responsible for coordinating the activities of this project <br />and completing a11 tasks identified in tlus Statement of Work. <br />Standards: All work under Activity 2 shall be performed in accordance with the standards specified in <br />Section 5 of this MAS. <br />Delive:rables: <br />• C`!VCB will provide a document listing the project management team along with their full contact <br />informatiorn. <br />• FE;MA/NSP will update the Scoping Tool files to includ~ the project management team and contact <br />ini:ormatiom. <br />Appendiar I may be dowrnloaded fram the FEMA Flood Hazard Mapping Web site at <br />n~://~Nww.~ema.~;ov/~di/:Fi~m/frm _ ~*sa~•.~ad~~ <br />Task:~-2 Initial Community Contact <br />i Respo;nsible Mapping Parlner: CWCB <br />Mapping Activity Statement No. 10: Montezuina County} 6 <br />Colorsido Water Conservation Board <br />
The URL can be used to link to this page
Your browser does not support the video tag.