Laserfiche WebLink
• Sc~tion 6--.Schedule <br />The activities documented in this MAS shall fl~e completed in accordance with the project schedule shown <br />in Table 6-1. If changes to this schedule are re,quired, the responsible Mapping Partner shall coordinate <br />with FEMA and the other Mapping Partners in. a time~y manner. <br />Table 6-11. Project Schedule <br />~ J <br />. <br />. <br /> <br /> <br />Activity 1 - Pre-Scoping <br />-. <br />-.- <br />.• <br />~ <br />Activity 2 - Scoping <br />Activity 3- Field Surveys and Reconnaissance <br />Activity 4- Topographic Data Development <br />Activity 5- Independent QA/QC Review of Tapographic Data <br />Activity 6 -Hydrologic Analyses <br />Activity 7-Independent QA/QC Review of Hyclrologic Analyses 7 <br />. <br />Activity 8 - Hydraulic Analyses <br />Activity 9- Independent QA/QC Review of H~idraulic Analyses 7 <br />Activity 10 - Floodplain Mapping (Detailed Riverine) <br />Activity l0A - Floodplain Mapping (Redelinea~tion Using Effective <br />Flood Profiles and Updated Topographic Data) <br />Activi~y l OB - Floodplain Mapping (Refineme:nt or Creation of Zone <br />A) <br />Activi~y 11 - Independent QA/QC Review of F'loodplain Mapping <br />(Revised Areas) ~ <br /> <br />• <br />Activity 12 - Base Map Acquisition <br />Activity 13 - DFIRM Production (Non-Revised Areas) <br />Activity 13A - Independent QA/QC Review of' DFIRD~I Production <br />(Non-Revised Areas) <br />Activity 14 - DFIlZM Production (Merging Re~rised arrd Non-Revised <br />Information) CWCB 4/30/06 <br />Activity 14A - DFIRM Production (Application of DFIRM Graphics <br />and Database Specifications) CWCB 5/30/06 <br />Mapping Activity Statement No. 11: Montezurria County <br />Colorado Water Conservation Board <br />12 <br />