Laserfiche WebLink
• experience who are appointed to fulfill these re;sponsibilities. When necessary, the assistance of the NSP <br />should be requested through the FEMA Project Officer, Kevin Long. <br />In addition, the NSP is required to coordinate ~~roject i.ssues with the responsible Mapping Partner that <br />created the MAS deliverable or portions of the MAS deliverable product and will document all such <br />coordination activities with the CTP and FEM,A. <br />Section 12-Project Coordination <br />Throughout the project, all members of the Prcject Team will coordinate, as necessary, to ensure the <br />products meet the technical and format specific,ations required and contain accurate, up-to-date <br />information. Coordination activities may incli;~de: <br />• Meetings, teleconferences, and videoa~nferences with FEMA and other Project Team members <br />as needed; <br />• Telephone conversations with FEMA and oth~~r Project Team members as needed; <br />• Updates to the MICS, MNiJSS databa;~e, and other FEMA status information systems in <br />accordance with requirements in Volu~nes 1 and 3 of Guidelines and Specifications for Flood <br />Hazard Mapping Partners; and <br />• E-mail, facsimile transmissions, and le:tters, a.; required. <br />• <br />r~ <br />U <br />Mapping Activity Statement No. 14: Montezurr,~a Courity 46 <br />Colorado Water Conservation Board <br />