Laserfiche WebLink
• agreement that the digital base map ca:n be used by FEMA. Documentation that the digital base <br />map can be used by FEMA will still bE, required. <br />Certifications must be made at the time the intE;rmedia.te data is submitted. For example, if hydrologic <br />data is submitted, certification will be required at the time it is submitted. <br />Section 8-Technical Assistance and Resources <br />Project Team members may obtain copies of FEMA-issued LOMCs, archived engineering backup data, <br />and data collected as part of the FEMA Mappi~~g Needs Assessment Process from the NSP, who may be <br />contacted by telephone at 720-514-1110 or by facsimile at 720-514-1120. <br />General technical and programmatic informati~~n, such as FEMA 265 and the Quick-2 computer program, <br />can be downloaded from the FEMA Web site (http://~r~ww.fema.~ov/fhm/). Specific technical and <br />programmatic support may be provided through the NSP; such assistance should be requested through the <br />FEMA Project Officer specified in Section 11 of this MAS. <br />Project Team members also may consult with 1:he FEMA Regional Project Officer to request support in <br />the areas of selection of data sources, digital data accu~racy standards, assessment of vertical data <br />accuracy, data collection methods or subcontra.ctors, and GIS-based engineering and modeling training. <br />Section 9-Contractors <br />CWCB intends to use the services of Andersari Consulting Engineers as a contractor for the Flood Map <br />• Project documented in this MAS. CWCB shall ensure that the procurement for all contractors used for <br />this Flood Map Project complies with the requirements of 44 CFR 13.36. <br />Part 13 may be downloaded in PDF or text fonnat from the U.S. Government Printing Office Web site at <br />http://www.access.gpo.~ovlnara/cfiJwaisidx 02/44cfr13 02.htm1. <br />Section 10-Financial Reporting <br />Because funding has been provided to CWCB by FENIA for the Flood Map Project documented in this <br />MAS, financial reporting requirements for CV6'CB will be in accordance with Cooperative Agreement <br />Articles V and VI. <br />CWCB will meet with the NSP and/or FEMA ,as need'ed to review the progress of the project. These <br />meetings will alternate between FEMA's Regi~~nal Of'fice and the CWCB office. <br />CWCB will provide to the NSP regular updates for each of the mapping activity statements. This may, at <br />FEMA's discretion be a spreadsheet template to be completed or the Monitoring Information on <br />Contracted Studies (MICS) system may be used. It may include dollars spent, hours spent, and percent <br />complete of each major Flood Map Project act:ivity (e.g., field survey, terrain, hydrology) on a county <br />basis. Specific reporting requirements will be finalized as a part of the scoping meeting. <br />Section 11-Points of Contact <br />The points of contact for this Flood Map Proje~~t are D~an Carlson, the FEMA Regional Project Officer; <br />. Karen Price, the Colorado Map Mod Coordinator for the CWCB; or subsequent personnel of comparable <br />Mapping Activity Statement No. 10: Montezurr,~a Cour~ty 45 <br />Colorado Water Conservation Board <br />