My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Montezuma (2)
CWCB
>
Grants
>
DayForward
>
Montezuma (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 12:17:55 PM
Creation date
1/6/2009 11:43:40 AM
Metadata
Fields
Template:
Grants
Applicant
Anderson Consulting Engineers, Inc.
Grant Type
FEMA
Fiscal Year (i.e. 2008)
2005
Project Name
Montezuma County DFIRM Project
CWCB Section
Watershed & Flood Protection
Contract/PO #
C154035
Grants - Doc Type
Scope of Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• neec~ed to complete the Project and its source; and the DFIRM format. This scope will be coordinated <br />with me ,mbers of the Project Team and the communities and county zrzvolved with the project. <br />The Project Scope will establish priority levels for flooding sources to be analyzed and mapped, and <br />estimate schedules and associated costs for com~pletion of the components of flood mapping. <br />Staradarcls: All work under Activity 2 shall be performed in accordance with the standards specified in <br />Section S of this MAS. <br />Delnver~~bles: CWCB will provide a Project Scope document in digital form and FEMA/NSP will update <br />t~e Sco~-ing Tool files to include the draft scope:. <br />Appendix I may be downloaded from the FEMt~ Flood Hazard Mapping Web site at <br />htt~://w~wv~.~'erna~;av/~df/~Ihm/fi~rn_ sai. df. <br />'~ask 2-9 Distribution of B~ckground Information <br />Respon:~ible Partner: CWCB <br />Scope: In preparation for the Scoping Meeting (Task 12), a detailed meeting agenda and scoping <br />present~ition will be prepaged in accordance wit:h the template provided in Appendi~c I, Subsection I.2.4 of <br />the Guidelines and Specifications for Flood Hazard Mapping Partners. The CWCB will distribute the <br />Scopin~; Meeting agenda and present the project scope to all meeting attendees at the Scoping Meeting. <br />Standards: All work unde~• Activity 2 shall be performed in accordance with the standards specified in <br />~ Section 5 of this MAS. <br />lDeliverables: ~opies of the Scoping Meeting Agenda will be distributed to the Project Team before the <br />Scoping Meeting. <br />Appendilc I may be downloaded from the FEIvIA Flood Hazard Mapping Web site at <br />l~tt~://~n~v~v.fem~.~ov~df/fl:m/~rm_ sg ai.pdf. <br />~ask 2-10 Scoping Meeting Activities <br />Respornsible Partner: CWCB and FEMA/NSP <br />Scope: The CVVCB will coordinate, set up, anci conduct the Scoping Meeting. This includes identifying a <br />g~ne, lc~cation, and all participants. The purpo~e of this meeting is to present the draft Scope of Project to <br />the local officials (state, county and municipal) and coordinate the prioritization of proposed study azeas. <br />FEMAi'NSP shall be responsible for compiling the necessary information for the meeting as contained on <br />the Scmping Meeting Ite~ Checklist. These ~tems may include: FIS and FIItM for affected communities; <br />USGS quads for the study area(s); b~st available community base map(s); effective FIRM summary; <br />Available Data Inventory; Scoping Map; aerial. photos/topagraphic mapping if available; existing drainage <br />studies or other Hydrology & Hydraulics (H&~ data; Community mas~er plan(s)/Drainage Master <br />Pl~n(s); Zaning Maps; Sti eet Maps; As-built p3ans; and Floodplain Ordinance(s). <br />Standards: All work under Activity 2 shall be Iperformea in accordance with t~ae standards spe~ified in <br />Sectiou 5 of this MAS. <br />~ <br />Mappir~g Activity Statement No. 10: Montexurna County} 10 <br />Colorado Water Conservation Board <br />
The URL can be used to link to this page
Your browser does not support the video tag.