My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD11630 (2)
CWCB
>
Floodplain Documents
>
DayForward
>
1100
>
FLOOD11630 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:25:17 AM
Creation date
1/5/2009 12:18:27 PM
Metadata
Fields
Template:
Floodplain Documents
County
Statewide
Basin
Arkansas
Title
Post Flood Assessment Report - Arkansas River
Date
9/15/1999
Floodplain - Doc Type
Flood Documentation Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
DAMAGES SUSTAINED <br />In El Paso County, where the rainfall was heaviest, initial damage estimates were near 15 million <br />dollars with damages in Manitou Springs alone estimated at 4 million dollars. In Pueblo County, <br />initial repair costs were also estimated to be nearly 15 million dollars. This early estimate <br />excluded total damage estimates for the hard hit areas east of Pueblo County, but one estimate <br />placed damage to crop land alone at close to 10 million dollars in the agricultural areas east of <br />Pueblo. Most counties affected by the flood were declazed disaster areas and made eligible for <br />state and federal assistance. Federal Emergency Management Agency (FEMA) inspectors were <br />sent to perform damage assessments to determine eligibility for federal aid. <br />On May 19, 1999 the Colorado Water Conservation Boazd issued a press release with very <br />preliminary flood damage estimates indicating damage to roads and bridges exceeded $25 <br />Million, individual losses exceeded $10 Million, and damage to irrigation systems exceeded $5 <br />Million. The Natural Resource Conservation Service (NRCS) compiled a list of eligible projects <br />on June 30, 1999 showing $10,036,736 worth of repairs to be done throughout the state of <br />Colorado, with the exception of Colorado Springs. The NRCS was projected to provide <br />$7,527,552 in Federal funding for the work shown at that time. Table 4-1 shows tl2e level of <br />damage reported by each county and the amount of relief provided under Federal, State and local <br />funding. Unless otherwise noted the amount of damages reported were provided by the Colorado <br />O~ce of Emergency Management on September 1, 1999. <br />Chapter 4- Flood Damages Prevented and Sustained <br />Post Flood Assessment Report 33 Draft Revised 0.9/IS/99 <br />