Laserfiche WebLink
4/11/2008 <br />Task 3 <br />Description of task: Construct wetland impoundments via contour levees, and install water level control structures. <br />Contract construction components to eligible parties. Provide construction management oversight through to <br />project completion. <br />Method or procedure that will be used or followed to accomplish the task and identify who will undertake the task: <br />Levee construction: Ducks Unlimited and USFWS have already surveyed and staked the levee locations for these <br />projects using in-kind services. The landowner is constructing the levees using funds as part of a small grant <br />secured by LSPWCD. Water Level Control Structures: Funds from LSPWCD - NAWCA grant will be used to <br />install agridrains, T-boxes and check structures, following a full survey by Ducks Unlimited. Open lateral ditches <br />will be replaced with pipelines to reduce the amount of water lost in the laterals and assure water can be placed in <br />recharge and storage facilities on the property. <br />Description of the major deliverables/products that will be produced upon successful completion of the task: <br />Ducks Unlimited will deliver a completed project with 32 acres of seasonal wetlands. <br />