Laserfiche WebLink
4/ 11 /2008 <br /> Contribution <br />Sources <br />Project Grant Match In- <br />Task $$ Match $$ Source kind Source Total <br />Task 1 $9,050 $3,359 Brush $12,409 <br /> $10,200 DU $1,097 DU $11,297 <br />Total $9,050 $13,559 $1,097 $23,706 <br />Golden Eagle Ranch <br />I. Task 1 <br />• Description of task: Conduct and complete a survey and design <br />• Method or procedure that will be used or followed to accomplish the task and identify who will undertake <br />the task: Ducks Unlimited surveyors will conduct a survey of the impacted area, identified on the attached <br />map. A topographic survey will be developed from the survey using AutoCAD 12 which will illustrate the <br />6" to 12" contours of the micro topography. DU's professional engineers will work with landowners, and <br />the contracted professional water engineers to provide a detailed design of wetland impoundments, water <br />level control structures, and water delivery infrastructure, including pipeline. <br />• Description of the major deliverables/products that will be produced upon successful completion of the <br />task: <br />^ Deliverables will include a detailed survey and design of the wetland project for the area <br />illustrated in the conceptual plan. <br />^ Provide a detailed bid package including all plans and specifications, and quantities for <br />materials and equipment. <br />Task 2 <br />• Description of task: Complete water engineering and water court filings <br />Method or procedure that will be used or followed to accomplish the task and identify who will undertake the <br />task: The landowner has hired Leonard Rice Engineers, Inc. and Bernard, Lyons, Gaddis & Kahn, P.C. to <br />develop the required engineering and legal documents to complete the water rights. Ducks Unlimited will <br />assist the landowner to assure that water rights are structured to benefit migrating and wintering waterfowl in <br />addition to providing recharge credits for use by the PRRP and agricultural interests. <br />• Description of the major deliverables/products that will be produced upon successful completion of the <br />task: <br />^ Complete engineering details associated with the recharge plan. <br />^ Copy of water court filings and substitute supply plan. <br />