My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FtCollinsLoveland_WCPlan_95%PR
CWCB
>
Water Efficiency Grants
>
Day Forward
>
FtCollinsLoveland_WCPlan_95%PR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2011 9:33:51 AM
Creation date
12/5/2008 10:49:00 AM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Planning Grant
Contract/PO #
OE PDA 08-56
Applicant
Fort Collins-Loveland Water District
Project Name
Fort Collins-Loveland Water District Water Conservation Plan
Title
95% Progress Report
Date
12/5/2008
County
Larimer
Water Efficiency - Doc Type
Interim Reports
Document Relationships
FtCollinsLovelandWCPlan2009
(Message)
Path:
\Water Conservation\DayForward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MEMORANDUM <br /> <br />CWS File #07-190 <br />To: Ms. Tammie Petrone, CWCB <br />cc: Mike Ditullio, Fort Collins-Loveland Water District <br />From: Val Flory, P.E. <br />Date: 8-27-08 <br />Subject: 95% Progress Report for Fort Collins-Loveland Water District Water Conservation Plan <br />Clear Water Solutions (CWS) has completed t he final draft of the Fort Collins-Loveland <br />Water District (FCLWD) Water Conservati on Plan in accordance with the Guidance <br />Document produced by the Colorado Wate r Conservation Board (CWCB). The <br />Guidance Document outlines nine steps in the water conservation planning process. To <br />date, CWS and the District have completed the nine steps per the scope of work and <br />the Plan is in the Public Review Period. The review period star ted on July 18, 2008 and <br />is scheduled to end September 16, 2008. Th e Draft Plan was reviewed by staff and the <br />Board and all comments incorporated. <br />Table 1 shows the water conservation goals as they evolved throughout the planning <br />process. Original goals were set after c haracterizing the District’s water distribution <br />system, customer categories and past and future water use in each of those categories. <br />Water conservation measures were then selected by the District staff and Board <br />through two screening processes including a co st/benefit analysis. Estimated savings <br />from the final measures we re then compared to the original water saving goals and <br />those goals were adjusted to better meet expected water savings. <br />Table 1 – Water Conservation Goals <br />ߪ»®¿¹» <br />Ю±¶»½¬»¼ ß²²«¿´ É¿¬»® <br />îððé ß²²«¿´ É¿¬»® Í¿ª·²¹ º®±³ <br />λª·»¼ λ¼«½¬·±² <br />É¿¬»® Ë» Í»´»½¬»¼ λ«´¬·²¹ <br />λ¼«½¬·±² Ù±¿´ º±® Ù±¿´ º±® д¿²²·²¹ <br />Ë» øîððè ¬± îðïé÷ Ю±¹®¿³ λ¼«½¬·±² <br />É¿¬»® Ë» Ý¿¬»¹±®·»æ д¿²²·²¹ ر®·¦±² ر®·¦±² <br />øßÚ÷øßÚ÷øû÷ øßÚ÷ øû÷øû÷ øßÚ÷ <br />øßÚ÷ <br />λ·¼»²¬·¿´éôíðêéôêéèèûêïìéðïçûèûêïì <br />ݱ³³»®½·¿´ éðèìëûìïïïìûëûì <br />×®®·¹¿¬·±²ëçëêîçïðûêíççïêûïëûçì <br />λ¿´ ͧ¬»³ Ô±» øéû÷êíìêêéïûçëçëïûïûçë <br />ß°°¿®»²¬ ͧ¬»³ Ô±» øëû÷ <br />ìëíìééìûíèïíèïìûìûíèï <br />̱¬¿´ Ü»³¿²¼ λ¼«½¬·±²æïïëèïîèçïïçð <br />̱¬¿´ É¿¬»® Ю±¼«½¬·±²æçôðëèçôëíë <br />̱¬¿´ л®½»²¬ λ¼«½¬·±²æïîûïìûïîû <br />
The URL can be used to link to this page
Your browser does not support the video tag.