Laserfiche WebLink
STATE OF COLORADO <br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colo rado 80203 <br />Phone: (303) 866 - 3441 <br />Fax: (303) 866 - 4474 <br />www.cwcb.state.co.us <br />TO: Colorado Water Conservation Board Members <br />FROM: Dan McAuliffe <br />Bill Ritter, Jr. <br />Governor <br />DATE: November 7, 2008 <br />Agenda Item 2 7 c , November 18 - 19, 2008 Board Meeting <br />SUBJECT: <br />Harris D. Sherman <br />DNR Executive Director <br />Water Supply Planning and Finance Section – En - bloc <br />Non - Reimbursable Investments , Water Planning <br />Jennifer L. Gimbel <br />CWCB Director <br />Studies <br />Dan McAuliffe <br />CWCB Deputy Director <br />The CWCB needs funding to meet unanticipated needs for projects and <br />studies and to provide assistance to entities related to water planning. These requests often take <br />the form of small grants for projects and studies . The General Assembly has in the past <br />authorized and appropriated money to the agency for “ W ater Planning Studies.” <br />The amount the CWCB has remaining in the Construction Fund authorized for Water Planning <br />Studies has been reduced over time. <br />Recommendation (written as proposed statutory language) <br />The Board should approve the inclusion the following provision in the 2009 Projects Bill: <br />SECTION __. Wa ter Planning Studies -- Continuation. <br />(1) The Colorado water conservation <br />board is authorized to expend up to one hundred thousand dollars ($100,000) from the Colorado <br />water conservation board construction fund to continue providing funds for water related <br />planning activities. (2) The moneys appropriated in subsection (1) of this section shall remain <br />available for the designated purposes until the project is completed <br />Past Water Planning Projects <br />Basin Planning Fact Sheets <br />Basin Planning Meetings <br />Center for Southwest Studies Water Quantity/Water Quality Facilitation (Joint Board Meeting) <br />Dolores Water Conservancy District and the Ute Mountain Ute Tribe joint reconnaissance study, <br />including Totten and Plateau Creek Reservoirs <br />Highland Ditch Company Evaluat e Canal Modernization and Secondary Water System Options <br />Union Ditch Company Evaluate Canal Modernization and Secondary Water System Options <br />New Consolidated Lower Boulder Reservoir and Ditch Company Evaluate Canal Modernization <br />and Secondary Water System Options <br />Previous Funding: $225,000 <br />Previous Disbursements: $175,727 <br />Available Balance: $ 49,273 <br />Water Supply Protection • Watershed Protection & Flood Mitigation • Stream & Lake Protection • Wat er Supply Planning & Finance <br />Water Conservation & Drought Planning • Intrastate W ater Management & Development <br />