My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150279 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150279 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2011 1:44:50 PM
Creation date
12/2/2008 10:07:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150279
Contractor Name
Boulder White Rock Ditch and Reservoir Company
Contract Type
Loan
Water District
0
County
Boulder
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Executive Summary <br />the amount of $2,429,800. The annual payment will be $131,780, assuming a 30 year loan at a <br />blended interest rate of 3.48%. Table ES-1 presents a summary of the requested project loan. <br />Table ES-1 <br />Project Loan Summary <br />Total Project Cost $2,673,000 <br />CWCB Loan (90% of Total Project Cost) $2,405,700 <br />CWCB Loan (Including 1% Service Fee) $2,429,800 <br />CWCB Annual Loan Payment $131,780 <br />Number of Shares 5500 <br />Annual Cost Per Share for Loan (approximately) $30 <br />Current Assessment per Share $15 <br />New Assessment per Share $45 <br />SCHEDULE <br />The design wi1J, ompleted by November 2008. Construction is scheduled to begin in <br />Decemberavv8 with its completion by May l~ ~~,~ Del ~~~~' <br />SSG <br />~S ES-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.