My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150278 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150278 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:14:49 AM
Creation date
12/2/2008 10:06:50 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150278
Contractor Name
Weldon Valley Ditch Company
Contract Type
Loan
Water District
0
County
Morgan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Rights <br />The shareholders of the WVDC have the ability to divert 165.0 cfs <br />from the South Platte River under their original irrigation right <br />decreed November 21, 1895 with an appropriation of October 26, <br />1881. The WVDC and its shareholders also have a conditional 2002 <br />water right for recharge. <br />As mentioned before, the WVDC has had an average annual diversion <br />of 36,000 acre feet for all water diverted into the Weldon Valley <br />ditch. Yearly diversions for the WVDC would be considered fairly <br />inconsistent. Variations in these numbers correspond to the <br />amount of rainfall during the irrigation season and overall <br />demand for recharge water. More rainfall in a certain year meant <br />that less water had to be diverted for irrigation that year and <br />vice versa. <br />Cost Estimate <br />The estimated total project cost is $150,000. Project planning <br />and engineering design will be provided by Nation Engineering <br />Services, LLC. <br />Item Estimated Cost <br />1. Planning and Design Costs $ 4,200 <br />2. Construction Cost with Contingency $145,800 <br />Total Cost $150,000 <br />A more specific cost break down is as follows: <br />Item Estimated Cost <br />1. 54" Concrete Pipe $ 33,600 <br />2. Rock for Bedding $ 2,800 <br />3. Drain Pipe $ 900 <br />4. Dewatering $ 13,000 <br />5. Equipment and Labor (siphon only) $ 37,600 <br />6. Concrete Inlet Structure $ 19,300 <br />7. Concrete Outlet Structure $ 14,300 <br />8. Contingency (200) $ 24,300 <br />9. Planning and Design Costs $ 4,200 <br /> Total Cost $150,000 <br />Feasibility Study <br />w~~ldon Valley Ditch Company <br />Cottonwood Draw Flume <br />September 2008 <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.