My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150278 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150278 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:14:49 AM
Creation date
12/2/2008 10:06:50 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150278
Contractor Name
Weldon Valley Ditch Company
Contract Type
Loan
Water District
0
County
Morgan
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 2: No water shall be diverted or delivered on account <br />of stock in the company unless it passes through the company's <br />headgate on the South Platte River and is measured through the <br />main weir on the company's main ditch, with the exception of <br />water delivered through headgate number one. Water delivered <br />through headgate number one must also be measured and the total <br />cubic feet per second must be measured and added to the amount <br />being measured through the main weir. Water delivered through <br />headgate number one has all the rights and restrictions of shares <br />measured over the company's main weir. (Ratified 1-12- <br />02)(Amended 1-7-OS) <br />SECTION 3: No person shall be entitled to take water from the <br />company's ditch except by means of delivery boxes, headgate to <br />laterals, or other structure for delivery of water constructed, <br />installed and maintained in accordance with standards established <br />by the Board. No structures shall be installed or maintained within <br />the right-of--way of the ditch except as ordered or permitted by the <br />Board and, when erected or installed for the delivery of water to a <br />shareholder, all costs of installation shall be borne by the <br />shareholder or shareholders for the delivery of whose water they <br />shall be installed. Where more then one shareholder is involved, <br />each shareholder shall be charged in proportion to the number of <br />shareholders receiving water through the structure. No water will <br />be delivered through the structure to a shareholder until his <br />proportionate share of the cost of the structure shall have been paid <br />to the company. <br />SECTION 4: Before commencing work on any delivery <br />structure, the Board may require, in advance, a deposit in the <br />estimated amount of the cost of the work. Any change in or <br />modification of a delivery structure except as authorized by the <br />Board shall be deemed to have been done by the shareholder <br />taking water there from and unless that shareholder can <br />demonstrate to the satisfaction of the Board that the change or <br />s <br />
The URL can be used to link to this page
Your browser does not support the video tag.