Laserfiche WebLink
Financial Analysis <br />The total estimated cost of this project is $401,883.90. The New Salida Ditch is applying <br />for a loan from the CWCB to finance all phases of the project with an estimated project <br />cost of $401,883.90. Phase 3 would be undertaken after evaluating the potential for <br />utilization of a 36 inch diameter pipe and the related reduction in cost prior to continuing <br />with that phase. Table 1 shows the various phases with related costs: <br />Table 1 Sources of Fundin <br />Phase Loan Amount CWCB <br />Partici ation NSDC <br />1 $113,777 0 % '~ <br />2 $119,717 % / % <br />3 $168,390 '~ ° o <br />Total $401,883 % ~' <br />The New Salida Ditch Company will cover any costs that exceed the estimated project <br />cost. <br />The New Salida Ditch Company is requesting a 30 year loan from CWCB. The standard <br />agricultural lending rate would be 2.5 percent, resulting in annual payments of <br />$17,468.46. Table 2 is a summary of the financial aspects of the project. Except for the <br />abnormal legal and remediation expenditures incurred as a result of activities in response <br />to resolution of the maintenance activities undertaken in 2005, annual assessments for <br />normal maintenance have historically averaged $50.00 per share. Based on a baseline <br />annual assessment of $50.00 per share, assessments would increase less than $44.00 per <br />share to a total of $94.00 per share annually after the year of construction (2009). Based <br />on annual diversions of 7114 acre feet the per acre foot cost of the annual assessment <br />increase is $2.46 per acre foot. <br />Table 2 Financial Summ <br />Project Cost $401,883 <br />Loan Amount(90 % of Project Cost) $362,000 <br />CWCB 1% Service Fee $3,620 <br />Total Loan Amount $365,620 <br />CWCB Loan Pa ent $17,500 <br />Number of Shareholders 14 <br />Number of Shares of Stock 400 <br />Current Assessment er Share $181.35 <br />Estimated total Assessment per share <br />(2008) $225.00 <br />T ical Assessment er Share $50.00 <br />Future Assessment er Share $94.00 <br />Annual Project Cost per Acre Foot <br />(Average annual diversions: 7114 acre foot) $2.46 <br />-4- <br />