My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10282008agenda
CWCB
>
Interbasin Compact Committee
>
DayForward
>
10282008agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2010 8:31:18 AM
Creation date
11/25/2008 9:18:44 AM
Metadata
Fields
Template:
Interbasin Compact Committee
Working Group
Public Education, Participation and Outreach
Title
October 2008 Meeting Minutes
Date
10/28/2008
Author
Nicole Seltzer
Interbasin CC - Doc Type
Meeting Notes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Coffin is doing this work for the IBCC, a nd the Roundtables should do this on their own. <br />The workgroup’s role is to support the Roundtable members in accomplishing this. <br />Task 3: Education of members of the Roundtable and the IBCC <br />The group thought that the survey should be delivered by the Edu cation Liaisons and <br />developed by the Workgroup. Other tactics w ould be to develop a list of interesting <br />presentations that could be available to th e Roundtables, as well as having the Basin <br />presentations to the IBCC go “on the road.” <br />After this discussion, each workgroup member gave their thoughts on what the priorities <br />should be. The group overwhelmingly supported the idea of working with the Education <br />Liaisons to develop educational programs to meet the Roundtables needs. This will <br />initially be accomplished through a survey of Roundtable members. In tandem, CFWE <br />staff will begin reviewing IBCC materials to su ggest information that could be used in <br />educational packets. The IBCC themed issu e of “Headwaters” will also begin production <br />soon so it can be completed by January 1. CFWE will also contact each Education <br />Liaison to discuss what needs they ha ve and if they understand their role. <br />Next Meeting <br />The next Workgroup meeting will be on Tues day, October 28, from 3-6PM in Colorado <br />Springs. This is subject to change, s hould the IBCC schedule a two day meeting as <br />discussed at the August IBCC meeting. <br />
The URL can be used to link to this page
Your browser does not support the video tag.