My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02148
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC02148
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:14:48 AM
Creation date
11/11/2008 11:25:15 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153788
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
3
County
Weld
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,.. <br />Plan of Study -Greeley and Loveland Irrigation System Rehabilitation Feavibility Study Page 5 <br />3. A comparative evaluation will be performed, with the Company's assistance, which will compare each <br />alternative with all of the other proposed alternatives based on cost, impacts and institutional <br />considerations. <br />4. The project sponsors will be given the opportunity to incorporate their comments and suggestions into <br />the alternative development phase of the study. Two presentations will be given to the Company to <br />incorporate their input into the alternative selection phase. <br />Products: <br />1. A memorandum will be prepared describing the methods used in evaluating the alternative elements <br />including institutional considerations. <br />2. Formulation of plan alternatives and the identification of a recommended alterative for the project. <br />Task 6 -Financial Analysis <br />Objective: <br />A detailed financial program is required by the C CB for project funding. The financial program describes <br />financing arrangements and the sources and uses o o fire period of dept retirement. <br />Methodology: <br />1. Identify and describe methods of p which could include CWCB loan, loans <br />from other agencies, or bank notes. p o d ' est rates associated with each type of <br />_financing will be described. ~ <br />2. Ultimate sources of funds for repayment of costs will be described in the study report. The repayment <br />funds may include assessments, water sales and grants. <br />3. A detailed schedule of estimated annual revenues and annual expenditures for the entire period of debt <br />retirement will be developed. The annual revenues will be estimated and presented for each source of <br />funds. Annual expenditures will be presented for debt retirement payments for each category of debt, <br />for operation and maintenance costs, and for payments to reserve funds. <br />4. Potential financial impacts of the project on the Company's revenue sources will be addressed in the <br />study report. "` <br />Products: <br />1. A thorough understanding of the financial feasibility of the Company's ability to repay all the <br />reimbursable costs associated with the project. <br />2. A memorandum will be prepazed describing the development of the financial program. <br />Task 7 -Study Report <br />Objective: <br />A study report is the formal documentation of the results and conclusions of all tasks performed for.,the study. <br />Methodology: <br />1. Incorporate the task memorandums into CWCB report format. The study will be prepazed in accordance <br />with Appendix C of the Guidelines for Financial Assistance through the Colorado Water Conservation <br />Board Construction Fund. <br />F:\PROJECTS\GREELE~I\CWCB\GRELOV.PRO <br />
The URL can be used to link to this page
Your browser does not support the video tag.