My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes 4-16-08 - FINAL
CWCB
>
Basin Roundtables
>
DayForward
>
Minutes 4-16-08 - FINAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/14/2010 8:42:54 AM
Creation date
10/9/2008 3:19:06 PM
Metadata
Fields
Template:
Basin Roundtables
Basin Roundtable
Yampa/White
Title
Yampa/White RT Minutes 4/08
Date
4/16/2008
Basin Roundtables - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF A REGULAR MEETING OF THE BOARD OF DIRECTORS <br />OF THE YAMPA-WHITE ROUNDTABLE <br />HELD IN RANGELY, APRIL 16, 2008 <br />Chairman, Tom Sharp called the meeting to order. Introductions were made. CNCC <br />President, John Boyd welcomed the roundtable. <br />The minutes from January 16, 2008 were approved. <br />rch gave an IBCC <br />in nature. In March <br />future to look like in <br />i Walden, there will <br />drew notice to the <br />on the Ener,v Needs <br />oil shale, coal and uranium <br />and modest, moderate and frill <br />gy demands of in situ oil shale <br />i could require as much <br />y produce 1765MW together. <br />The CWCB gave conditional approval to the Water Quality Study of the Yampa River. <br />There were questions regarding whether the legislation allows funding for a quality <br />study. The conditions on approval were to strengthen the quality versus supply <br />correlation to staff s satisfaction. <br />Eric Hecox reported that the IBCC Newsletter had a report on the Consumptive Water <br />Needs Assessment. The Assessment extends the timeline of SWSI to 2050. <br />Eric also reported that the Yampa-White Basin's SB-179 account balance currently <br />stands at $342,490. An additional $300,000 will be available to the basin on July 1, 2008. <br />The original four year timeline to spend the money was extended by one year. It is <br />anticipated that the fiends need to be allocated by March 2010. Remaining amounts at that <br />time will be made available to all basins.
The URL can be used to link to this page
Your browser does not support the video tag.