Laserfiche WebLink
TABLE 10 <br />TOTAL PROJECT COST SUMMARY <br />ITEM ALTERNATIVE I ALTERNATIVE 2 <br />1. Feasibility Study $ 27,000 $ 27,000 <br />2. Water Rights Total $ 387,250 $ 387,250 <br />a. Purchase $ 305,000 $ 305,000 <br />b. Engineering $ 40,000 $ 40,000 <br />c. Legal Fees <br />d. Bridge Loan Fees <br />3. Measurement Structures <br />4. Recharge Reservoir Total <br /> <br />a. Construction i <br /> <br /> <br />i <br />+.. <br />i $ <br />$ <br />$ <br />$ <br />~ <br />$ 40,000 <br />2,750 <br />80,600 <br />80,000 <br /> <br />56,000 $ 40,000 <br />$ 2,750 <br />$ 80,600 <br />$ V 80,000 <br /> <br />$ 56,000 <br />b. Contingency (20%) $ 12,000 $ 12,000 <br />c. Engineering/Legal/Surveying ;~ $ 12,000 $ 12,000 <br />5. Storage Reservoir Total ---- $ 536+~ <br />a. Construction ------ $ 384,000 <br />b. Contingency (20%) --°-- $ 77,000 <br />c. Engineering/i,egal/Surveying ------ $ 75,000 <br />6. Total Project Cost $ 574,850 ~ $1,110,850 <br />8. S. S Selected Project <br />The company has chosen Alternative 2 which includes the purchase of the required water rights, the <br />construction of the recharge reservoir, and the construction of the storage reservoir. The cost of this <br />alternative is estimated at approximately $1,110,850. <br />Work included in Alternative 2 is as follows: <br />Feasibility Study of the Ogilvy Augmentation Comparry Page l7 <br />Well Augmentation Project <br />