My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150271 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150271 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 9:25:07 AM
Creation date
9/25/2008 11:00:51 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150271
Contractor Name
WRCC, Inc.
Contract Type
Loan
Water District
0
County
Larimer
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br /> <br /> <br /> <br />10.2.2 As-constructed drawings that meet the format requirements of Rule 5; <br />10.2.3 A final construction report containing the following information, if applicable, <br />in accordance with the requirements of Rule 9; a summary of construction, problems <br />encountered, and solutions implemented to resolve the problems; a summary of <br />construction material tests and geologic observations; photographs of construction <br />from exposure of the foundation to completion of construction; <br />10.2.4 A record of the location of permanent monuments and instrumentation as well <br />as installation details and initial surveys and readings shall be submitted, if <br />applicable; <br />10.2.5 A schedule for the first filling of the reservoir specifying fill rates, water level <br />elevations to be held for observation, and a schedule for inspecting and monitoring <br />the dam. No filling schedule is required for minor dams rated Low Hazard and all <br />NPH dams or if waived by the State Engineer for good cause shown. The dam <br />owner, however, shall monitor the dam frequently during the first filling; and <br /> <br />r <br /> <br /> <br /> <br />i ~~ <br /> <br />1 <br /> <br /> <br />10.2.6 Along-term instrumentation monitoring plan for new dams and enlargements <br />(except for minor Low Hazard and all NPH dams) that shall include: the frequency of <br />monitoring; the data recording format; graphical presentation of data; and, the parties <br />who will perform the work. <br />10.3 The engineer shall provide periodic review of the data included in the long-term <br />monitoring plan on at least an annual basis for the first five years, whereupon the <br />monitoring shall continue in accordance with Rule 15. The engineer shall submit the data <br />and a written assessment of the dam's performance to the State Engineer annually. <br />10.4 Upon written request by the owner and for good cause shown, the State Engineer <br />may temporarily approve storage of water prior to full compliance with Rule 10. The <br />written request shall include a schedule for compliance with Rule 10, a certification letter <br />signed and sealed by the engineer in accordance with Rule 10.2.1, a schedule for the first <br />filling of reservoir in accordance Rule 10.2.5, and a monitoring plan for observing the <br />behavior of the dam and appurtenances during the initial filling or refilling of the <br />reservoir. For High and Significant Hazard dams, an Emergency Action Plan prepared in <br />accordance with Rule 16 shall be developed by the owner and approved by the State <br />Engineer prior to placing any water in the reservoir. Only a partial reservoir filling will <br />be granted under this Rule. Final acceptance of the construction for full use of the <br />reservoir will not be granted until the requirements of Rule 10 have been satisfactorily <br />completed. <br />10.5 The engineer and/or owner shall submit an Emergency Action Plan that conforms to <br />Rule 16 within 60 days after the final construction inspection. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.